Laserfiche WebLink
AUG-28-2007 13:29 Service Station Systems 408 938 8888 P.05 <br /> Monitnring System Certification-Pa of 3 <br /> Site Address: 2448 W. Kettleman Ln. @ Lower Sacramento Date ofTcsting/Servicing: �J <br /> F. In -Tank Gauging/SIR Equipment. ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SiR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination, inCluding testing for ground faults? <br /> ❑ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD); ❑ Check this box if LLD's are not installed. <br /> Com I e the folio ing checklist: <br /> es ❑ No* For equipment start-up or annual equipment certif�ation was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simuiated leak reate:W1`3 g.p.h. (1.); ❑ 0.1 g.p.h. (2.); O 0.2 b.p.h. (2). <br /> Notes: 1. Required for equipment start-up certification and annual certification. <br /> 2. unless mandated by local agency, certification required only for electronic LLD start-up. <br /> es ❑ Nos Were all LLD's confirmed operational and accurate within regulatory requirements? <br /> es ❑ No* Was the testing apparatus properly calibrated? <br /> es ❑ No* For mechanical LLD's,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ No* . For electronic LLD's, does the turbine automatically shut off if the LLD detects a leak'? <br /> A <br /> ❑ Yes ❑ Nom; For electronic LLD's. does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> t�'hl/A or disconnected? <br /> ❑ Yes ❑ No* For electronic L.LD's, does the turbine automatically shut off if any portion of the monitoring system <br /> /A malfunctions or fails a test? <br /> ❑ Yes ❑ No*. For electronic LLD's, have all accessible wiring connections been visually inspected? <br /> L� <br /> tYl�/A <br /> es ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> H. Cotnments; l Fz1�, k) — �"cj C� rS I f7dlrf�G' <br /> TOTAL P.05 <br />