My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
COMPLIANCE INFO 2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 1:14:28 PM
Creation date
4/29/2019 2:10:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 20: PREPARE FILL RISER FOR VALVE INSERTION <br />IMPORTANT: Inspect the riser pipe for any foreign ma- <br />terial. Over spray from tank relining or any internal <br />burrs inside of pipe must be removed prior to installa- <br />tion. Failure to have an unobstructed riser pipe may <br />prevent proper installation or operation of the valve. <br />Thoroughly clean top of riser pipe. <br />STEP 21: REMOVE ELASTIC BAND <br />Remove the elastic band securing the float to the valve <br />body. The float will move into an outward position. <br />STEP 22: INSERT DROP TUBE <br />Make sure the upper O -Ring gasket is under the flange <br />of the inlet tube. Hold the float down against the valve <br />body and slowly insert the drop tube overfill valve into <br />the riser pipe. Do not force valve into the riser pipe. If <br />any obstruction or foreign matter interferes with <br />smooth insertion of the valve, the riser pipe must be <br />cleared. <br />WARNING <br />Failure to follow the assembly <br />and installation instructions or <br />use of excessive force to insert <br />the OPW 71 SO will VOID THE <br />WARRANTY. <br />Difficulty in removing the existing <br />fill tube (if there is one) means <br />there may be an obstruction in the <br />riser pipe. Look for burrs, defor- <br />mations, excess tank lining materi- <br />al or <br />other projections that may <br />interfere with easy insertion of the <br />OPW 71 SO. The 71 SO is designed <br />for insertion into schedule 40 pipe. If Figure 22 <br />schedule 80 pipe has been used for the <br />riser, the 71 SO cannot be installed. If seamed pipe has <br />been used, the internal weld bead may interfere with <br />the OPW 71 SO and prevent installation. If the OPW <br />71 SO won't slip in easily DON'T FORCE IT! Damage to <br />the valve may result if excess force is used. Examine the <br />riser pipe carefully; determine the nature of the obstruc- <br />tion; take appropriate steps to remove it. <br />STEP 23: CHECK INSTALLATION <br />Insert the drop tube all the way into the tank until the <br />flange and gasket seat onto the top of the Face Seal <br />Adaptor. The float will swing out into the operating <br />position as it passes into the tank. <br />Figure 23 <br />Make sure that the float is aligned along the length of <br />the tank. The length of the tank can easily be deter- <br />mined by locating other manholes or pump boxes that <br />are installed around other tank fittings. Look into the <br />drop tube and align the deflector with the length of the <br />tank. <br />For testable models only: Unthread the socket adap- <br />tor assembly from the inlet tube (a 3/8" square drive <br />extension will attach to the socket adaptor, secure all <br />tools to ensure they don't fall into the tank or valve) and <br />ensure float and poppet move freely when socket adap- <br />tor assembly is pulled on. When looking down into the <br />upper tube ensure poppet is visible when socket adap- <br />tor is pulled and resets properly when socket adaptor is <br />released. See page 17 for full testing details. If poppet <br />does not actuate freely take appropriate steps to correct <br />before proceeding. <br />CAUTION: No obstruction in the tank can be within <br />14"from the center of the riser pipe or the valve <br />may not operate properly (See Figure 24). <br />STEP 24: ALIGN VALVE <br />Install the OPW Jack Screw Kit and a 4"NPT nipple to <br />lock the valve in place. Refer to the Installation Instruc- <br />tions supplied with the Jack Screw Kit. For testable <br />models ensure that the socket adaptor is aligned so <br />it does not interfere with the jack screw kit. (see Fig - <br />24A). Install the Rotatable Product Adaptor (Refer <br />to Installation Instructions supplied with the Product <br />Adaptor.) Make sure that the valve does not rotate <br />while tightening the adaptor by observing the position <br />of the deflector. The valve must remain aligned <br />along the length of the tank as in Step 23. Repeat <br />this step as necessary to assure proper valve alignment. <br />ILI <br />
The URL can be used to link to this page
Your browser does not support the video tag.