My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
COMPLIANCE INFO 2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 1:14:28 PM
Creation date
4/29/2019 2:10:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 25: INSTALL WARNING PLATE <br />Bend the three warning plate ears down then slide the <br />tie wrap over the warning plate ears and position warn- <br />ing plate against riser pipe approximately 1" below the <br />adaptor. Tighten the tie wrap securely. The valve is <br />now fully installed and in operating position. <br />NOTE: the warning plate includes important warn- <br />ings, operating parameters, and listing information <br />and must be installed. <br />Figure 25 <br />STEP 26: VALVE REMOVAL <br />The valve can be removed for tank leak testing, inspec- <br />tion, etc., by removing the Rotatable Product Adaptor, <br />the 4" nipple, and the Jack Screw Kit. Reinstall per the <br />above instructions. <br />For testable models only: Itis not necessary to re- <br />move the valve to check poppet movement /function. <br />See Page 17 for full testing details. <br />STEP 27: ELECTRONIC LIQUID LEVEL MONITORING <br />If an electronic level monitor is installed, it must be cali- <br />brated to match the top of the 71 SO valve body, which <br />must correlate with 95% of the actual tank capacity. <br />Manufacturer: "OPW" <br />Model:'71 SO -4" <br />(4" represents size) <br />Manufacture Date. <br />"MFG MMYY" <br />MM =Month YY=Year <br />Figure 26 -Product Identification <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.