Laserfiche WebLink
5_ gv.rnNnAPv PIPF TFQ riNTr-- <br />fest Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Specie') <br />Test Equipment Used: Test reducer boots, Nitrogen and gauges Equipment Resolution: 0.5% of span <br />el M'I <br />Piping Run # 87 <br />Piping Run # 91 <br />Piping Run # Diesel <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />3" <br />3" <br />Length of Piping Run: <br />100, <br />100, <br />100' <br />Product Stored: <br />Gasoline <br />Gasoline <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Reducer Boots!('ittines <br />Reducer Boots/Fittings <br />Reducer Boots/Fittings <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 minutes <br />10 minutes <br />10 minutes <br />Test Start Time: <br />8:00 am <br />8:00 am <br />8:00 am <br />Initial Reading (Rj): <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />9:00 am <br />9:00 am <br />9:00 am <br />Final Reading (RF): <br />5 psi <br />5 psi <br />5 psi <br />Test Duration: <br />I hr. <br />I hr. <br />1 hr. <br />Change in Reading (RF Ri): <br />None <br />None <br />None <br />Pass/Fail Threshold or <br />Criteria: <br />No detectable Loss <br />No detectable Loss <br />No detectable Loss <br />Test Result: 1 <br />© Pass 0 Fail <br />© Pass 0 Fail <br />® Pass 0 Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />