My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
COMPLIANCE INFO 2013 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2022 1:14:28 PM
Creation date
4/29/2019 2:10:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013 - 2018
RECORD_ID
PR0231948
PE
2361
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
01
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5) Dipstick number (X) = 82" <br />Tank diameter (Y) = 92" <br />(Y) - (X) = (Z) (92" - 82 = 10") <br />(Z) = 10" <br />6) (Z) -2"=C (10"-2"=8") <br />C=8" <br />7) Is 8" less than 6-1/2"? <br />NO Measure the distance from the top of the 400 Face Face Seal Adaptor installed on the riser pipe <br />to the inside, top lip of the storage tank and ob- <br />tain measurement (A). <br />Upper tube length = C + (A) <br />For testable models only, ending in "T": Upper Tube <br />Length = C + (A) - 1-1 /2" <br />ASSEMBLY INSTRUCTIONS <br />IMPORTANT: Each of the numbered steps in the instal- <br />lation instructions are designed as a CHECK LIST to en- <br />sure proper installation and trouble free operation of <br />the OPW 71 SO Overfill Prevention Valve. <br />Read and follow these steps carefully, checking them <br />off as you proceed. <br />Figure numbers correspond to step numbers for easy <br />reference. <br />STEP 1: MEASURE <br />Install the OPW Face Seal Adaptor and the OPWThread- <br />on Spill Container on the Fill Riser (Refer to the Installa- <br />tion Instructions Supplied with the Spill Container). In- <br />sert a tape measure through the riser pipe and hook it <br />under the inside of the tank in the lengthwise direction. <br />Measure the distance from the top of the Face Seal <br />Adaptor threads inside the base of the spill container <br />bucket just below the drain valve outlet window to the <br />inside, top lip of the storage tank (Dim. "A") (See Figure <br />1 &1A). <br />The top flange on the 71 SO will rest on the Face Seal <br />Adaptor just below the drain valve outlet, and be <br />locked in place between the Face Seal Adaptor and the <br />4" nipple that is installed in the spill container with the <br />Jack Screw Kit (See Figure 1A). (For riser pipe configu- <br />rations other than that shown, consult installation <br />drawings or use other necessary means to measure Di- <br />mension "A"). <br />Using a tape measure, measure the distance from the <br />top of the Face Seal Adaptor in the spill container to the <br />bottom of the tank (Dim. "B"). <br />IMPORTANT: Inspect the riser pipe for any foreign ma- <br />terial. Over spray from tank relining or any internal <br />burrs inside of pipe must be removed prior to installa- <br />tion. Failure to have an unobstructed riser pipe may <br />prevent proper installation and operation of the valve. <br />The 71 SO is designed for installation into schedule 40 <br />riser pipes. The 71 SO cannot be installed into schedule <br />80 riser pipes. <br />STEP 2: MARKTHETUBE <br />Use the result from Step 1 and HOW TO LOCATE THE <br />POSITION OF THE 71 SO AT 95% TANK CAPACITY to <br />mark the upper tube. Measure the distance from the <br />seam where the upper tube and valve body meet. Use <br />a tape measure to mark the calculated upper tube <br />length onto the upper tube. See Figure 2. <br />Tape measure <br />Riser Pipe <br />with Face (A) <br />Seal Adaptor To Tank <br />(B) <br />Top (I.D.) <br />To Tank <br />Bottom <br />Figure 1 <br />Figure 1A <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.