My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
COMPLIANCE INFO 2005 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 11:25:56 AM
Creation date
5/2/2019 8:40:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2015
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2 ASSEMBLY OF LEGS TO PROCESSOR <br /> Please refer to FIGURE 5, the processor general arrangement drawing, for <br /> the following instructions. <br /> FIGURE 5: Processor FIGURE 6 <br /> (general arrangement) <br /> rWeather Cover SHELL <br /> Outer Shell <br /> Stack , <br /> t� Air bap <br /> PADLOCK <br /> BASE <br /> Vapor Feet <br /> peLEG <br /> Connection <br /> Ground level mount requires the use of the 48" Legs, and canopy or roof <br /> mount will require the 5" or longer Legs. If Legs not already purchased, see <br /> your local Hirt distributor. <br /> 5.2.1 Bolt appropriate Legs to Base of processor. Be sure to use the <br /> bolts, lock washers, and nuts provided with the Legs. Note that <br /> Legs attach behind corner angle brackets of Base, See FIGURE 6 <br /> for details. <br /> 5.2.2 Bolt feet to concrete, deck plate, and/or solid non-flammable <br /> structure. Note, concrete mount will require the use of (4) 1/4" DIA. <br /> X 3" RED HEAD wedge anchors (i.e. 2.5" embedment). <br /> WARNING: Do not block 1.5" air gap between processor Shell and Base. This <br /> gap allows combustion air to reach thermal oxidizer. Also, keep the <br /> processor area free and clear from combustibles, keep a minimum <br /> clearance of 2 ft. all the way around processor. <br /> Page 14-8 <br /> ARB Approved IOM-14—Hirt VCS 100 Processor Installation Manual—Executive Order VR-205-B <br />
The URL can be used to link to this page
Your browser does not support the video tag.