My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
COMPLIANCE INFO 2005 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 11:25:56 AM
Creation date
5/2/2019 8:40:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2015
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. INSTALLATION OF INDICATOR PANEL <br /> Indica -tor Paned Face <br /> Overpressure Lamp <br /> (RED) <br /> Power Switch/ <br /> La-P(GREEN) <br /> HIRT COUSTION ENGINEERS, NC <br /> POWER/ PROCESSING OVERPRE URE <br /> OFF ON <br /> il�9JJ GASOLINE APOR RECOVERY SYSTEM <br /> Pntent os, 6,197,300 L 6.478.376 <br /> ProcessincU Lamp <br /> (GREEN) <br /> Install the Indicator Panel at a location chosen for the following considerations: <br /> 6.1 Indoors <br /> 6.2 Access by attendant. <br /> 6.3 In view of attendant. <br /> 6.4 Ease of conduit run to station's main electrical panel. <br /> 6.5 Ease of conduit run to processor location. <br /> 7. CONNECTION OF ELECTRICAL AND VAPOR PIPE <br /> Remove Processor's Weather Cover, Shell, and electrical panel lid prior to <br /> performing the following steps. <br /> 7.1 ELECTRICAL POWER SUPPLY <br /> 7.1.1 Note that the power to the Indicator Panel and processor comes <br /> through the station master switch and the emergency pump <br /> shutdown switch. See FIGURE 7. <br /> 7.1.2 Wire size should be per local electrical code for an eight (8) ampere, <br /> 120 VAC load. Be sure to include circuit protection per local code. <br /> Also, system must be electrically grounded in accordance with local <br /> Page 14-9 <br /> ARB Approved IOM-14—Hirt VCS 100 Processor Installation Manual—Executive Order VR-205-B <br />
The URL can be used to link to this page
Your browser does not support the video tag.