Laserfiche WebLink
6. INSTALLATION OF INDICATOR PANEL <br /> Indica -tor Paned Face <br /> Overpressure Lamp <br /> (RED) <br /> Power Switch/ <br /> La-P(GREEN) <br /> HIRT COUSTION ENGINEERS, NC <br /> POWER/ PROCESSING OVERPRE URE <br /> OFF ON <br /> il�9JJ GASOLINE APOR RECOVERY SYSTEM <br /> Pntent os, 6,197,300 L 6.478.376 <br /> ProcessincU Lamp <br /> (GREEN) <br /> Install the Indicator Panel at a location chosen for the following considerations: <br /> 6.1 Indoors <br /> 6.2 Access by attendant. <br /> 6.3 In view of attendant. <br /> 6.4 Ease of conduit run to station's main electrical panel. <br /> 6.5 Ease of conduit run to processor location. <br /> 7. CONNECTION OF ELECTRICAL AND VAPOR PIPE <br /> Remove Processor's Weather Cover, Shell, and electrical panel lid prior to <br /> performing the following steps. <br /> 7.1 ELECTRICAL POWER SUPPLY <br /> 7.1.1 Note that the power to the Indicator Panel and processor comes <br /> through the station master switch and the emergency pump <br /> shutdown switch. See FIGURE 7. <br /> 7.1.2 Wire size should be per local electrical code for an eight (8) ampere, <br /> 120 VAC load. Be sure to include circuit protection per local code. <br /> Also, system must be electrically grounded in accordance with local <br /> Page 14-9 <br /> ARB Approved IOM-14—Hirt VCS 100 Processor Installation Manual—Executive Order VR-205-B <br />