My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
COMPLIANCE INFO 2005 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 11:25:56 AM
Creation date
5/2/2019 8:40:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2015
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
codes, or in the absence of local codes, with the current edition of <br /> the National Electrical Code, ANSI/NFPA70. <br /> 7.1.3 Conduit access to the processor is through the bottom of the <br /> processor's electrical panel. Be sure to use a sealed cable fitting <br /> approved for use in Class I, Groups C and D, Division 2 areas where <br /> the conduit enters the panel. <br /> FIGURE 7: Field Wiring <br /> E <br /> VAC POWCR, CMEI2GENCY SHUTI)OWN SWITCH,SHORT CIRCUIT PROTECTION BY OTHERS <br /> r------------ <br /> 1 2 I I <br /> I I <br /> 1 1 <br /> iav� 1 I <br /> or rw PROC/C'fS�)IN6 nKirnllut �� � <br /> I I <br /> I I VCS 100 <br /> 4 7 PROCESSOR <br /> 2 c`� � I <br /> I I <br /> INDICATOR I I <br /> PANEL I 1 <br /> I I <br /> 4 I <br /> 1 ELECTRICAL <br /> 1 1PANEL <br /> r—� `---------,_ <br /> I I <br /> I I <br /> I I <br /> I I <br /> 1 I <br /> I I <br /> I I <br /> 0 I TERMINAL <br /> STRIP <br /> 1 I <br /> Cry <br /> I 1 <br /> I f <br /> 1 0 I <br /> I I <br /> I I <br /> I <br /> I I <br /> I I <br /> I I I I <br /> I 1 <br /> I I 1 I <br /> rTHERMAILWITCI4 <br /> <DEPRESS RED FU4HBUTTON TO RESET) <br /> 7.2 GASOLINE VAPOR SUPPLY <br /> 7.2.1 A vapor pipe is needed to connect the processor to the ullage of all <br /> the gasoline storage tanks. Use 2" NPT galvanized pipe for runs up <br /> to 300 ft. Usually the vapor pipe connects to the vent pipes, <br /> however, any connection to the ullage of the storage tanks, other <br /> than direct connection to the dispenser's vapor return pipe, is <br /> acceptable. See FIGURE 8. <br /> Page 14-10 <br /> ARB Approved IOM-14—Hirt VCS 100 Processor Installation Manual—Executive Order VR-205-B <br />
The URL can be used to link to this page
Your browser does not support the video tag.