My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
COMPLIANCE INFO 2005 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 11:25:56 AM
Creation date
5/2/2019 8:40:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2015
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING SYSTEM CERTIFICATION <br /> For Use By All Jurisdictions Within the.Stute of CaU%61.110 <br /> .-I whorily Cited: Chapter 6.7, Health and Safety Cocle;Chapter 16 Dh1i5i017 3, Till,23, California Cole of Regulations <br /> This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be <br /> prepared for each Monitoring system control panel by the technician who performs the work. A copy of this form must be provided to <br /> the tank system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems <br /> within 30 clays of test date. <br /> A. General Information I n Q Bldg.No.: <br /> Facility Name: '"1 <br /> Site Address: )�I _ r� U City:f 'mlC,� +�# gZip: ') Z� <br /> Facility Contact Person: �t�XliGs Contact Phone No.:(��))1Zip: <br /> Make/Model of Monitoring System:�Q-Pc)Q-f �' Date of Testing/Servicing:(�1�/na <br /> B. Inventory of Equipment Tested/Certified <br /> Cheek the a>pro rime boxes to indicate s iecific a ui meat ins ected/sell,icc( <br /> l: <br /> Tank 1D: T—) LF Tank 11): <br /> In-Tank Gauging Probe. Model:_ NI�4C� �_____ Xln-Tank Gauging Probe. Model: ! � <br /> 1Annular Space or Vault Sensor. Model:_ t4 )- ; nnular Space or Vault Sensor. Model: 14W <br /> !J Piping Sump/Trench Sensor(s). Model:__ ZU� Piping Sump/Trench Sensor(s). Model: Zt�, <br /> ❑ Fill Sump Sensor(s). Model: Fill Sump Sensor(s). Model: _ <br /> ❑ Mechanical Line Leal:Detector. Model: L-1) 'Loo•J fd Mechanical Line Leak Detector. Model: De --k3.l. e <br /> ❑ Electronic Line Leak Detector. Model: ❑ Electronic Line Leak Detector. Model: <br /> ❑ Tank.Overfill/High-Level Sensor. Model: ❑ Tank Overfill/High-Level Sensor. Model: <br /> ❑ Other(s ecify equipment ty ie and model in Section E on Page 2). ❑ Other(s ecif y equipment ty ie and model in Section E on Page 2). <br /> Tank ID: 9 { Tank ID: <br /> �In-Tank Gauging Probe. Model: Nl to C, (__ ❑ In-Tank Gauging Probe. Model: <br /> Annular Space or Vault Sensor. Model: tf ZD L) Annular Space or Vault Sensor. ]Model: <br /> jd"Piping Sump/Trench Sensor(s). Model: 2 Cab ❑ Piping Sump/Trench Sensor(s). Model: <br /> ❑ Fill Sump Sensor(s). Model: ---- LJ Fill Sump Sensor(s). Model: <br /> A Mechanical Line Leak Detector. Model: 2 —_ ❑ Mechanical Line Leak Detector. Model: <br /> ❑ Electronic Line Leak Detector. Model:_- ❑ Electronic Line Leak Detector. Model: <br /> ❑ Tank Overfill/High-Level Sensor. Model: ❑ Tank Overfill/High-Level Sensor. Model: <br /> ❑ Other(specify e ui meat q'pe and model in Section Eon Page 2). ❑ Other(s ecifv e ui)ment ty e anti model in Section E on Page 2). <br /> Dispenser ID: 17 z _ Dispenser ID: > - ----- <br /> ❑ Dispenser Containment Sensor(s). Model: ____ ❑ Dispenser Containment Sensor(s). Model: <br /> Shear Valve(s). !Lar Shear Valve(s). <br /> Dis)enser Containment Float(s)and Chain(s). IWispeilser Containment Float(s)and Chain(s). <br /> Dispenser ID: <br /> Dispenser ID: f <br /> AC; if � ---- —- <br /> ❑ Dispenser Containment Sensor(s). Model: <br /> ❑ Dispenser Contatnment Sensor(-,). Model: p -- --- <br /> ( Shea-Valve(-,). 0 Shear Valve(s). <br /> Dispenser Containment Floatds)and Chain(-,). Dis enser Containment Float(s)and Chain(-,). <br /> Dispenser ID: Dispenser ID: - --- <br /> ❑ Dispenser Containment Sensor(s). Model: ❑ Dispenser Containment Sensor(s). Model: <br /> ❑ Shear Valve(s). ❑ Shear Valve(-,). <br /> ❑Dis enser Containment Floats). and Chain(s). ❑ Dispenser Containment Float(s)and Chain(s). <br /> 11'the facility contains more tanks or dispensers,copy this form. Include information for every tank and dispenser at the facility. <br /> C. Certification - I certify that the equipment identified in this document was inspected/serviced in accordance with the <br /> manufacturers' guidelines. Attached to this Certification is information (e.g. manufacturers' cheeldists) necessary to verify that this <br /> information is correct and at Plot Plan showing the layout of monitoring equipment. For any equipment capable of generating such <br /> reports,I have also attached a copy of the report;(check all that applt'): ❑S ste i set-up ❑Alarm history report <br /> Technician Name(print): Felix Ran irez Signatul•e: <br /> Certification No.— License.No.• UTTL#08-1740 ICC#5273934-UT <br /> Testing Company Name: ���b r� � T Phone No.:(��)7�4 " b l E Z <br /> Site Address:'Jo �.a\31� ��� <br /> U. l _ Date of Testing/Servicing /Z 7 <br /> "j: Page I of 03/01 <br /> Monitoring System Certification <br /> D. Results of Testing/Servicing <br />
The URL can be used to link to this page
Your browser does not support the video tag.