Laserfiche WebLink
Software Version Installed: '(0 <br /> Co t>lete the following checklist: <br /> Yes ❑ No* Is the audible alarm operational? <br /> es ❑ No* Is the visual alarm operational? <br /> es ❑ No* Were all sensors visual) ins ected,functional) tested,and confirmed o erational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> N/A operational? <br /> Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to oper ,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that npp/y) ump/Trench Sensors; L3 Dispenser C ntamment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s) and operating properly? If so, at what,percent of tank capacity does the alarm trigger? <br /> i.:) Yes* Z No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> �] Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑ Water. If yes,describe causes in Section E,below. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set tip reports, if applicable <br /> Yes ❑ No* Is all monitorin equipment oerational eer manufacturer's s ecifrcations? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: - <br /> Page 2 of 3 03/01,.- <br />