My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
COMPLIANCE INFO 2005 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 11:25:56 AM
Creation date
5/2/2019 8:40:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2015
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Software Version Installed: '(0 <br /> Co t>lete the following checklist: <br /> Yes ❑ No* Is the audible alarm operational? <br /> es ❑ No* Is the visual alarm operational? <br /> es ❑ No* Were all sensors visual) ins ected,functional) tested,and confirmed o erational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> ❑ Yes ❑ No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> N/A operational? <br /> Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak,fails to oper ,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that npp/y) ump/Trench Sensors; L3 Dispenser C ntamment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s) and operating properly? If so, at what,percent of tank capacity does the alarm trigger? <br /> i.:) Yes* Z No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> �] Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product; ❑ Water. If yes,describe causes in Section E,below. <br /> Yes ❑ No* Was monitoring system set-up reviewed to ensure proper settings?Attach set tip reports, if applicable <br /> Yes ❑ No* Is all monitorin equipment oerational eer manufacturer's s ecifrcations? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: - <br /> Page 2 of 3 03/01,.- <br />
The URL can be used to link to this page
Your browser does not support the video tag.