My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
COMPLIANCE INFO 2005 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 11:25:56 AM
Creation date
5/2/2019 8:40:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2015
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page A of—I <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer 0 Industry StandardSp e c ify) fessional Engineer <br /> 0 Other Xro <br /> Test Method U*ei,: 0 Pressure 0 Vacuum ydrostatic <br /> El Other(Specify) I <br /> Test Equipment Used: (f ej 4.,,j e I LtAXcw• e-44-em- Equipment Resolution: <br /> Sump# <br /> Sum 4 <br /> Sump# Z_ Sump# <br /> Sump Diameter: 2-t 1 qrL11 L/7 t, <br /> Sump Depth: q'i I 1 5011 Y71-1," <br /> Sump Material: 'F ,ted 4 S S R `�,v e,q.S <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: I S R it is " P� <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> 12� <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested' vj-14 �fW_L 2►' 044-n-t-e"L1111 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both es 0 No 0 NA es 0 No 0 NA es ONo DNA11 Y s VED] o DNA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> ')KY <br /> shutdown?* El es 0 No 0 NA es 0 No NA Xes 0 No 1)NA El Yes No D NA <br /> Was fail-safe verified to be 1. <br /> opera onal?* 0 Yes r-_QNo 0 NA 0 Yes 0 NA 0 Yes o 0 NA 0 Yes ❑No 0 NA <br /> Wait time betwe5ing <br /> pressure/vacuunQz <br /> gjE#d starting <br /> test: <br /> Test Start Time: <br /> Initial Reading(Rj): P s-T S"A5-17 <br /> Test End Time: 9, /j, 0: yd 8, ?_�— <br /> Final Reading(RF): 5 1°S--+-- 5 ns-r5 fils--r- <br /> Test Duration: p P- I tA-ej tt k1- <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or Criteria: nvs Om td3 <br /> Test Result: 15K-Pass 0 Fail Pass 0 Fail Pass 0 Fail Pass 0 Fa� <br /> Was sensor removed for testing? Yes 0 No 0 NA Yes 0 No 11 NA )<Yes El No 0 NA tes. 0 No El NV I <br /> Was sensor properly replaced and Yes <br /> 1 verified functional after testing? es 0 No 0 NA ))-(Yes El No 0 NA /Yes 0 No 0 NA ONo ON <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SVrRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.