Laserfiche WebLink
SWRCB,January 2002 Page 3 of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: Wiping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> 43 her(Spec) <br /> Test Method Usp.:j: 'ressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Speci ) <br /> Test Equipment Used:prpg u,✓V. PS-T lmo,Yovo Equipment Resolution: 1 <br /> rv, � ��s. .t£ irA Piping Run# Piping Run# Z Piping Run iping Run# <br /> Nf. ,.Tras ,i atS„s' . 1.,. tP. <br /> Piping Material: = �a a r 4 �e�w �J .�• .�r <br /> Piping Manufacturer: .� <br /> Piping Diameter: 3 k 3 L l ti <br /> Length of Piping Run: yoke l2U AD Ytf, l p pyo 1 <br /> Product Stored: V,,�dk V i <br /> Method and location of piping-run isolation: 1121-1 <br /> e between applyingd i I I I V I I <br /> ssure acuum/water and <br /> test: <br /> Test <br /> l l�v u✓ L.o wv l��uu� <br /> Test Start Time: 8 <br /> Initial Reading(Rj): <br /> Test End Time: 9 <br /> Final Reading(RF): fi P5:t <br /> Test Duration: �cvu l/ `�v cc✓ l Gcat.�V <br /> Change in Reading(RF-RI): <br /> Pass/Fail Threshold or <br /> Criteria: IJ La55►vk t uv O S Z <br /> Test Result: ass ❑Fail ass ❑Fail Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />