Laserfiche WebLink
SWRCB.January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum O Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Pressure Gauge in PSI Equipment Resolution: 0-15 Psi <br /> Piping Run# I Piping Run#2 Piping Run#3 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter. 3" 3" 3" <br /> Length of Piping Run: 12' 50' 70' <br /> Product Stored: Diesel Regular Premium <br /> Method and location of Test Boot Test Boot Test Boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 Min 5 Min 5 Min <br /> starting test: <br /> Test Start Time: 8:10 8:15 8:55 <br /> Initial Reading(RI): 5 PSI 5 PSI 5 PSI <br /> Test End Time: 8:40 8:45 9:05 <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI <br /> Test Duration: 30 Min 30 Min 30 Min <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or 0 Drop 0 Drop 0 Drop <br /> Criteria: <br /> Test Result: z Pass ❑Fail x Pass ❑ Fail x Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing, and i-ecommended follow-up forfailed tests) <br />