My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
COMPLIANCE INFO 2005 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 11:25:56 AM
Creation date
5/2/2019 8:40:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2015
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB.January 2002 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum O Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Pressure Gauge in PSI Equipment Resolution: 0-15 Psi <br /> Piping Run# I Piping Run#2 Piping Run#3 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter. 3" 3" 3" <br /> Length of Piping Run: 12' 50' 70' <br /> Product Stored: Diesel Regular Premium <br /> Method and location of Test Boot Test Boot Test Boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 Min 5 Min 5 Min <br /> starting test: <br /> Test Start Time: 8:10 8:15 8:55 <br /> Initial Reading(RI): 5 PSI 5 PSI 5 PSI <br /> Test End Time: 8:40 8:45 9:05 <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI <br /> Test Duration: 30 Min 30 Min 30 Min <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or 0 Drop 0 Drop 0 Drop <br /> Criteria: <br /> Test Result: z Pass ❑Fail x Pass ❑ Fail x Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments— (include information on repairs made prior to testing, and i-ecommended follow-up forfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.