My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
COMPLIANCE INFO 2005 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2020 11:25:56 AM
Creation date
5/2/2019 8:40:18 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005 - 2015
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
445
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer El Industry Standard X Professional Engineer <br /> 0 Other(Spec) <br /> Test Method Used: 0 Pressure D Vacuum X Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 min <br /> Sump#3 Sump# <br /> Sump# I Sump#2 <br /> Sump Diameter: 42" 42" 42" <br /> Sump Depth: 44" 44" 44" <br /> Sump Material: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 20" 24" 23" <br /> Highest Piping Penetration:_ <br /> Height from Tank Top to Lowest 17" 18" 16" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry <br /> Portion of Sump Tested' 2"above Highest Piping Penetration <br /> Does turbine shut down when x Yes 0 No 0 NA UYes ONO DNA <br /> sump sensor detects liquid(both x Yes 0 No 0 NA xYes ONO [INA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe xYes; ONO [INA xYes ONO DNA x Yes 0 No 0 NA 0 Yes 0 No El NA <br /> shutdown?* <br /> Was fail-safe verified to be OYes xNo DNA 0 Yes x No 0 NA []Yes xNo DNA 0 Yes 0 No 0 NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 Min 5 Min 5 Min <br /> test: <br /> Test Start Time: 8:25 8:45 9:20 <br /> Initial Reading(Rj): 0 0 0 <br /> Test End Time: 8:55 9:15 9:50 <br /> Final Reading(RF): 0 .0025 0 <br /> Test Duration: 30 Min 30 Min 30 Min— <br /> Change in Reading(RF-Ri): 0 .0025 0 <br /> Pass/Fail Threshold or Criteria: .005/30 min .005/30 min .005/30 min <br /> Test Result: x Pass 0 Fail x Pass 0 Fail x Pass 0 Fail 0 Pass 0 Fail <br /> Was sensor removed for testing? xYes ONO [INA x Yes 0 No 0 NA x Yes El No 0 NA 0 Yes 0 No 0 NA <br /> Was sensor properly replaced and x Yes [I No DNA xYes ONo DNA x Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> verified functional after testin ? ,_ I <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) — <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to Agy of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.