Laserfiche WebLink
SWRCB January 2002 RE0g1yFD <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: X Pressure ❑Vacuum J y ro <br /> ART9ViE6UT <br /> ❑Other(Spec) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Approx. 120' Approx. 100' Approx.30' <br /> Product Stored: Regular 87 Super 91 Diesel <br /> Method and location of Test boot at STP Test boot at STP Test boot at STP <br /> piping-run isolation: Piping Sump#1 Piping Sump#2 Piping Sump#3 <br /> Wait time between applying 15 Minutes 15 Minutes 15 Minutes <br /> pressure and starting test: <br /> Test Start Time: 10:25 10:50 10:35 <br /> Initial Reading(R,): 3 Psi 3 Psi 3 Psi <br /> Test End Time: 11:25 11:50 11:35 <br /> Final Reading(RF): 3 Psi 3 Psi 3 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-Rj): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No loss in Psi No loss in Psi No loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass Pass <br /> Comments— (include information on repairs made prior to testing and recommended follow-up for failed tests) <br />