My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 4:43:00 PM
Creation date
5/2/2019 9:27:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amok Adik <br /> SAN JOAQUE COUNTY ENVIRONMENTAL HEALTH D _ RTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION ❑ 1.NEW PLAN J, 2.CHANGE OF INFORMATION X101 <br /> PLAN TYPE A MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. M02. <br /> (Check one rn only) [ITHIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> L.FACILITY INFORMATION <br /> FACILITY ID#( ency Use Only) <br /> FACILITY NAME xZ Moa <br /> FACILITY SITE ADDR j M04. CITY ()LMos. <br /> EQUIPMENT TESTING AND PREVENTIVE MAIN;/TrENANCE <br /> State law requires that testing,pr\entive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes ine leak detectors,etc.)be performed in N106accordance with the equipment murers'instructions,or annually,whichever is more frequent. Such work mu be performed by qualified personnel. <br /> MONITORING EQUIPMENT ISICED 1.ANNUALLY ❑ 99.OTHE (Specify): Mol. <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Pla showing the general tank and piping layouts and the locations w ere monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control p el,etc.). If you already have a diagram(e.g.,current UST nitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,e which shows all required information,include it with t Is Ian. <br /> IV. TANK MONITORIN <br /> MONITORING IS PERFORMED USING THE FOL WING METHOD(S):(Check all that apply) n110. <br /> J� 1.CONTINUOUS ELECTRONIC MONITORING TANK ANNULAR(INTERSTITIAL) ACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMEN I : 1 l a. RY b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM MI1. <br /> PANEL MANUFACTURER: Mlz. MODEL#: �S�-���- M13. <br /> LEAK SENSOR MANUFACTURER: _ M14. MODEL#(S): e ,,�(7� M15. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM CJAEDO MONITOR SINGLE ALL TANK(S) <br /> PANEL MANUFACTURER: M16. MODEL#: MIT <br /> IN-TANK PROBE MANUFACTURER: M" MODEL#(S): M19 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M20 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): M21. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0. h. ❑ c.OTHER(Specify): M22. M23. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2 ❑ b.STATISTICAL PER 23 CCR§2646.1 M24. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS M25. <br /> 015.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: [� a.ANNUALLY b.BIENNIALL ❑ c.OTHER(Specify): 6126. M27. <br /> ❑ 6.VISUAL MONITORING DONE: a.DAILY ❑ b.WEEKLY(Requi agency approval) <br /> ❑ 99.OTHER(Specify): M28. <br /> . PIPE MONIT01h.,NG <br /> MONITORING IS PERFORMED USING THE FOLLOWI G METHOD(S)(Check all that apply Mao. <br /> NJ 1.CONTINUOUS ELECTRONIC MONITORING O PIPING SUMP(S)/TRENCH(ES)AND ER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMEN ISa.DRY ❑ b.LIQUID FILLED ❑ .UNDER PRESSURE ❑ d.UNDER VACUUM M31. <br /> PANEL MANUFACTURER: = MODEL#: zzr, .- ,y�r-� M33. <br /> LEAK SENSOR MANUFACTURER: f MA MODEL#(S): �/ 1 49 M35. <br /> WILL A PIPING LEAK ALARM T ER AUT MATIC PUMP(i.e.,TURBINE)SHUTDO _T a ❑ b.NO YES M36. <br /> WILL FAILURE/DISCONNECTI OF THE MONITORING SYSTEM TRIGGER AUTOMATIC UMP SHUTDOWN? aa.YES ❑ b.NO M3z <br /> 42.MECHANICAL LINE LEAK DE CTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. L K TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEA IS ETECTED <br /> MLLD MANUFACTURER 11 I I-Ar r•T M38. MODE #(S): �� /(� M39 <br /> ❑ 3.ELECTRONIC LINE LEAK TECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTU R: M40. MODEL#: M41. <br /> PROGRAMMED L E INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MIN M ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DE CTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43. <br /> WILL ELLD F LURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44. <br /> ❑ 4.INTEGRITY TING <br /> TEST F QUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) M45. M46. <br /> �5.VISUAL N'ITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* RI c.MIN.MONTHLY&EACH TIME YSTEM OPERATED" M47. <br /> •Requires agency approval -Allow for onitoring of unburied emergency generator f piping only per HSC§25281.5(b)(3) <br /> ❑ 6.PIPIN IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636 (3) <br /> ❑ 7.NO RODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99. THER(Specify) M48. <br /> SJCEHD-d(07/03)-1/4 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.