My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8115
>
2300 - Underground Storage Tank Program
>
PR0231563
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2020 4:43:00 PM
Creation date
5/2/2019 9:27:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231563
PE
2361
FACILITY_ID
FA0000110
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8115
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8115 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AML <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 2 <br /> VI. DISPENSER MONITORING <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply: uo. <br /> ❑ 1.CO OUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> P ^L MANUFACTURER: M51. MODEL#: M52. <br /> LEAK SOR MANUFACTURER: M53. MODEL#(S): M54. <br /> WILL DE TION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a.YES ❑ b.NO Mss. <br /> WILL A UDC AK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M56. <br /> WILL FAIL SCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP S TDOWN? ❑ a.YES ❑ b.NO M57. <br /> 2.MECHANICAL ASSE Y(e.g.,FLOAT D CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE INC SE OF LEAK <br /> ASSEMBLY MANUFA R:�.e4 M5B MOD #(S): Msv. <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) M60. <br /> ❑ 4.NO DISPENSERS <br /> El99.OTHER(Specify) M61. <br /> VII. ENHANCED LEAK DETEC ON <br /> ❑ L WE HAVE BEEN NOTIFIED BY THE STA WATER RESOURCES CONTROL BOARD TIA T WE MUST IMPLEMENT ENHANCED LEAK M70. <br /> DETECTION(FLD)FOR THE UST(S)COVEXED BY THIS PLAN.PER 23 CCR§2644.1,E D IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILI (Check all that apply) Mao. <br /> 1. THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. OPERATING MANUALS FOR ELECTRONIC MO ORING EQUIPMENT(R uired) <br /> 3. THE FACILITY'S BEST MANAGEMENT PRACTICE e(q ed as of 1/01/2 5) <br /> 4. CALIFORNIA UNDERGROUND STORAGE TANK RE LATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWR ) PUBLI TION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUG F SMALL UNDERGROUND STORAGE T.�*IKS" <br /> 99. ❑ OTHER(Specify): M81. <br /> Personnel with UST monitoring responsibilities are familiar with all of the abo a ocuments relevant to their job duties and can access those documents when needed. <br /> By January 1,2005 this facility will have a"Designated UST Operator"wh as ssed the operator exam administered by the International Code Council(ICC). By <br /> January 1,2005,and annually thereafter,the "Designated UST Operator" ill trai facility employees in the proper operation and maintenance of the UST systems. <br /> This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the f ility's best man ement practices. <br /> ➢ The facility employee's role with regard to the leak detection uipment. <br /> ➢ The facility employee's role with regard to spills and ove�l <br /> ➢ Whom to contact for emergencies and leak detection alarm . <br /> For facility employees hired on or after January 1,2005,the ini I training will be conducted thin 30 days of the date of hire. <br /> IX. CO NTS/ADDITIONAL NFORMATION <br /> Please use this section to include any additional UST syste monitoring-related information(e.g.,a ditional information required by your local agency): Mas. <br /> X. PERSONNEL RESPONSIBI LIT S <br /> AS OF 1/1/05, THE"DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CU T UST OPERATING PERMIT APPLICATION — <br /> FACILITY FORM WILL HAVE ULT TE AUTHORITY FOR PERFORMING THE MONITORING ACTITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS AN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHL VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANC WITH 23 CCR§2715(b). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> C ATION:I certity that the information pro ided herein is true and accurate to the best of y knowledge. <br /> WNER/OPERATOR SLCL TU REPRESENTING DATE: M91. <br /> ad <br /> El owner M90. <br /> Ick [:3 Operator /l�J <br /> Orl` UY!4.i��OINAME(print): ) > M92. OWNER/OPERATOR TITL M99. <br /> (Agency ZySignature: <br /> ) This plan has been reviewed and: ❑Approved ❑Approved With Conditions ❑Dis proved <br /> Local AgDate:Commenl Conditions: <br /> SJCEHD-d(07/03)-3/4 SQ_� Af P P <br /> r-u /a/� 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.