Laserfiche WebLink
19) After stabilization, collect one groundwater sample from each well. Samples will be <br /> collected in EPA 40-m1 vials. Each sample will be collected using a new disposable <br /> bailer. <br /> 20) Transport groundwater samples under chain-of-custody to a state-certified laboratory <br /> for analysis. Groundwater samples will be analyzed for TPH as Stoddard Solvent and <br /> BTE&X in accordance with EPA methods GCFID/5030 and 602, respectively. <br /> 21) Prepare a report detailing the results of the work in an appropriate format to be <br /> submitted to the PHS/EHD. The report will be signed by a Registered Geologist. <br /> The opportunity to prepare this work plan is greatly appreciated. If you have any questions <br /> or comments, please contact our office. <br /> Sincerely, <br /> GEOLOGICAL AUDIT SERVICES, INC. <br /> • Shelly Walker <br /> Project Manager <br /> SC-94.P5-973.3//H PDA.1,6 WPL12N 7 <br />