I„� y
<br /> P .s �� � ° 1.C' 4. _t b1�1 am lrl- � '• 11 pyla. `� n,'.�
<br /> r�, l- 1�1 •, ,.;5s.,r
<br /> 20 Xugllst 2Q01 95-01'1 r
<br /> ` `p;GE NC Piplect
<br /> f.Page,4;0f 9
<br /> pecantami? tiori;LL dvZncement SaMplmg foals
<br /> xe°hole a Al,
<br /> 2.3;3. EquiPmcnt L ' tb each bo
<br /> T( of
<br /> ' team cleaned prion shed"with':a dnlh49
<br /> �,;iere 5 1 wa, :.Follo'wing _
<br /> au ers ling labeled,
<br /> The hallow stem g for sample collection,wre than to each saznp placed in prapexly ;
<br /> with clean,tap,wate p ubhc
<br /> axil brass Sleeves u l nosed, mating the equipment wasp a ;
<br /> on=site in an area lar
<br /> krpg p
<br /> d were thorough y d.from decontam d was stored
<br /> ate`generate dnm�s`•an
<br /> activities,rinse or1e1 17H'S5-gallon „
<br /> ovpld
<br /> D.O.T.-app".
<br /> r4
<br /> an organic 'vapor
<br /> •. o ing , • . ' . � or 'anic"vaporl�ing A
<br /> 2.3'.41 L gg resence of g ental 580
<br /> o Enviranm• . fied
<br /> ere monitored for the p e Therm, ce.with the Uni
<br /> le duplicates w detector ( iri accordan .
<br /> soil same hota-ionizati(n described ob bor.nglo
<br /> meter equipped with. p
<br /> leve) and Were-visuaily , re included as App . ,
<br /> ed to isobuty Boring
<br /> lags.a
<br /> alibrat stem(U"�CS�'
<br /> Classification y • • ,
<br /> • -- lis •
<br /> well Completion water monitoring we
<br /> lAonitoring leted as ground �a,d 25 feet of
<br /> 2,'.3.5. le-camp well casing ,, ..
<br /> 9 and M 7 0 v+rere sing pV C). r 1'was.,single
<br /> W olyvinylchloridot( •Soil,borings
<br /> s Mme$, diameter
<br /> bear
<br /> : 5sai1 borings 2 inch diai•rieter blank p •0 0,c0�mclt ) 6-inch diam .
<br /> utilizing.schedule 0, etei PVC. Well-,casing.( schedule 40,, eter P` C,Well casing ;
<br /> 22-inch well utilizing _inch diarn
<br /> perforated, /extraction erfdrated,
<br /> o d water reep" and.30 feet of p . .
<br /> completed as a de (PVC)well casing
<br /> tori of the
<br /> yvin lch au h the hollow stem•,
<br /> �. •poi Y - = . . - �
<br /> OZO-inch slot) assembly 1�0:2112 LOr1e5tar F,
<br /> (0. PVC well;casing, xaised`as
<br /> lacing a ark mixture 1 °,
<br /> ipstalled`by:p •n :The augers were incremental a d a filter.
<br /> Each v
<br /> ell was tat depth'ofthe bari .b11W-gM -9,and M `f was"Slowly pouted do�.t��
<br /> V augers to the to pack) in wells tiara well E - e filter pa was
<br /> d filter p duel for etrac stein auger- Th two
<br /> Lapis Luster sora ( rQximately. t
<br /> is Luster sono?.nand the inner wall of the hollow to a point app
<br /> 2112 Lgnestar Lap of the bong as inserted into the
<br /> Well cos g froln the bottom a surge block w 5 mutes,
<br /> annulus bctw t to he filter pack placetxient, .edl for'approxi�ately'
<br /> laced adjacent to the. screened' fallowing )repeat Y ,• ere hydrated with
<br /> p eta of the screen, d lowered(surged " •ack.and w
<br /> t '
<br /> feet above tl?. p alternately raised an were placed above.the filter p. ,.. out,seal)..As-,.
<br /> d was artlapd Cement.(g
<br /> vell.casirig an (annular seal) backfilled with p
<br /> ace was.
<br /> 'Two feet'of bentonite chips annular sp. chided as opepdix B ;
<br /> - _ _ •- ,• S
<br /> water:The rem diagrams are .
<br /> clean tap well-construction
<br /> built monitoring
<br /> �- '' _ ,_ : , `•p�tvottesd Geo�nviron�neatal,jne. ,
<br />
|