Laserfiche WebLink
I„� y <br /> P .s �� � ° 1.C' 4. _t b1�1 am lrl- � '• 11 pyla. `� n,'.� <br /> r�, l- 1�1 •, ,.;5s.,r <br /> 20 Xugllst 2Q01 95-01'1 r <br /> ` `p;GE NC Piplect <br /> f.Page,4;0f 9 <br /> pecantami? tiori;LL dvZncement SaMplmg foals <br /> xe°hole a Al, <br /> 2.3;3. EquiPmcnt L ' tb each bo <br /> T( of <br /> ' team cleaned prion shed"with':a dnlh49 <br /> �,;iere 5 1 wa, :.Follo'wing _ <br /> au ers ling labeled, <br /> The hallow stem g for sample collection,wre than to each saznp placed in prapexly ; <br /> with clean,tap,wate p ubhc <br /> axil brass Sleeves u l nosed, mating the equipment wasp a ; <br /> on=site in an area lar <br /> krpg p <br /> d were thorough y d.from decontam d was stored <br /> ate`generate dnm�s`•an <br /> activities,rinse or1e1 17H'S5-gallon „ <br /> ovpld <br /> D.O.T.-app". <br /> r4 <br /> an organic 'vapor <br /> •. o ing , • . ' . � or 'anic"vaporl�ing A <br /> 2.3'.41 L gg resence of g ental 580 <br /> o Enviranm• . fied <br /> ere monitored for the p e Therm, ce.with the Uni <br /> le duplicates w detector ( iri accordan . <br /> soil same hota-ionizati(n described ob bor.nglo <br /> meter equipped with. p <br /> leve) and Were-visuaily , re included as App . , <br /> ed to isobuty Boring <br /> lags.a <br /> alibrat stem(U"�CS�' <br /> Classification y • • , <br /> • -- lis • <br /> well Completion water monitoring we <br /> lAonitoring leted as ground �a,d 25 feet of <br /> 2,'.3.5. le-camp well casing ,, .. <br /> 9 and M 7 0 v+rere sing pV C). r 1'was.,single <br /> W olyvinylchloridot( •Soil,borings <br /> s Mme$, diameter <br /> bear <br /> : 5sai1 borings 2 inch diai•rieter blank p •0 0,c0�mclt ) 6-inch diam . <br /> utilizing.schedule 0, etei PVC. Well-,casing.( schedule 40,, eter P` C,Well casing ; <br /> 22-inch well utilizing _inch diarn <br /> perforated, /extraction erfdrated, <br /> o d water reep" and.30 feet of p . . <br /> completed as a de (PVC)well casing <br /> tori of the <br /> yvin lch au h the hollow stem•, <br /> �. •poi Y - = . . - � <br /> OZO-inch slot) assembly 1�0:2112 LOr1e5tar F, <br /> (0. PVC well;casing, xaised`as <br /> lacing a ark mixture 1 °, <br /> ipstalled`by:p •n :The augers were incremental a d a filter. <br /> Each v <br /> ell was tat depth'ofthe bari .b11W-gM -9,and M `f was"Slowly pouted do�.t�� <br /> V augers to the to pack) in wells tiara well E - e filter pa was <br /> d filter p duel for etrac stein auger- Th two <br /> Lapis Luster sora ( rQximately. t <br /> is Luster sono?.nand the inner wall of the hollow to a point app <br /> 2112 Lgnestar Lap of the bong as inserted into the <br /> Well cos g froln the bottom a surge block w 5 mutes, <br /> annulus bctw t to he filter pack placetxient, .edl for'approxi�ately' <br /> laced adjacent to the. screened' fallowing )repeat Y ,• ere hydrated with <br /> p eta of the screen, d lowered(surged " •ack.and w <br /> t ' <br /> feet above tl?. p alternately raised an were placed above.the filter p. ,.. out,seal)..As-,. <br /> d was artlapd Cement.(g <br /> vell.casirig an (annular seal) backfilled with p <br /> ace was. <br /> 'Two feet'of bentonite chips annular sp. chided as opepdix B ; <br /> - _ _ •- ,• S <br /> water:The rem diagrams are . <br /> clean tap well-construction <br /> built monitoring <br /> �- '' _ ,_ : , `•p�tvottesd Geo�nviron�neatal,jne. , <br />