My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MADISON
>
420
>
2900 - Site Mitigation Program
>
PR0521765
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2019 4:36:46 PM
Creation date
5/6/2019 4:13:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0521765
PE
2950
FACILITY_ID
FA0014781
FACILITY_NAME
CARANDO MACHINE WORKS
STREET_NUMBER
420
STREET_NAME
MADISON
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
420 N MADISON ST
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.2 Soil Remediation <br /> The soil and groundwater remediation program was observed by Treadwell&Rollo on 19 and <br /> 20 April 2005. The 2005 Workplan proposed excavation of contaminated soil and groundwater <br /> around sample location CPT-EXC-BT-19. The-excavation was 25 feet wide by 10 feet long by <br /> 25 feet deep as shown on Figure 2. The excavation extended to 25 feet deep,which is <br /> approximately 6.0 feet below the 19-foot deep groundwater table in order to remove <br /> contaminated groundwater and contaminated saturated soil. <br /> The proposed excavation represented approximately 230 cubic yards(bench yards)or up to 370 <br /> tons of soil,,,and=it�was-estimated-that up to-12;000 gallons of contaminated-groundwater:ma be_.=, <br /> .removed, Excavation below 25 feet was not attempted due to limitation at the shoring available. <br /> Since the excavation perimeter was shored, it was not proposed to collect confirmation samples <br /> from the sidewalls. <br /> 4.3 Shoring and Soil Excavation <br /> On 13 April through 19 April 2005 the perimeter of the excavation was shored with interlocking <br /> metal sheet piles. The shored excavation dimensions were 25 feet long, 10 feet wide and 25 feet <br /> deep. Previous sampling had indicated that the top 15 feet of soil was not contaminated; <br /> therefore this soil was stockpiled separately from.the bottom 10 feet of the excavation. <br /> Approximately-150 cubic-yards ofsoil-excavated=deeper.than=l-5-feet:bgs=were-removed:and;:� <br /> , .stockpiled for characterization?Mr.Jeff Wong of the SJCEHD was periodically on site to <br /> observe the excavation. <br /> 4.4 Groundwater Extraction,Treatment and Disposal <br /> Approximately-7,50&gallons of groundwater were pumped from the excavation-and stored in an <br /> 18;000 gallon-Baker- to analysis. The analytical results met the discharge <br /> requirements-of the City.of-Stockton.Municipal-"Utilities Department(SMUD),and SMUD <br /> ,issued a'25 May 2005 discharge permit'for the-water:(Appendix A). On 26 May 2005 the <br /> 25971024.DGD 6 7 June 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.