Laserfiche WebLink
MAR-12-2012 14: 12 Service Station Systems 408 938 8888 P.aS <br /> Monitoring System Certification - rage 3 of 3 <br /> Site Address: 340$ Manthey Road - ^ Date of Testing/Servicing: 2/13/12 <br /> F. in -Tank Gauging/SIR Equipment: 1P Check this box if tank.gauging is used only for inventory control, <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lett the folio ing checklist: <br /> ❑ Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> 0 Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> 0 Yes 0 No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested'? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line I.,eak Detectors (LLD): D Check this box if LLD's are not installed. <br /> Cam lete the folio M2 checklist: <br /> 0 Yes 0 No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance., <br /> ❑ N/A (Che(:k all that apply) Simulated leak rate: IM 3 s.p,h. (1.); ❑ 0.1 g.p.h. (2.); ❑ 0.2 g.p.h.(2.), <br /> Notes: 1. Required for equipment start-up certification anti annual Certification. <br /> 2. Unless mandated by local agency,certification required only for electronic LLD start-up. <br /> 0 Yes ❑ No* Were all LLO's confirmed o crational and accurate within regulatory requirements? <br /> 3 Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLD's,docs the LLE?restrict product flow if it detects a leak? <br /> 0 N/A <br /> ® Yes ❑ No* For electronic LLD's,does the turbine autornaticztlly shut off if the LLD detects a leak? <br /> ❑ N/A <br /> 3 Yes ❑ No* For electronic LLD's,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 0 N/A or disconnected? <br /> Ycs ❑ No* For electronic LLD's,docs the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A malfunctions or fails a test? <br /> W Yes ❑ No* For electronic LT.,D's, have all accessible wiring connections been visually inspected? <br /> 0 N/A <br /> 19 Yes Q No* Were all items on the equipment manufacturer's maintenance checklist completed'? <br /> * In Section Flt below,describe how and when these deficiencies were or will he Corrected. <br /> H. Comments: <br />