Laserfiche WebLink
SV RCB,ranuary 2002 Page of <br /> 5_ SECONDARY PIPE TESTING <br /> Test Method Developed By: x Piping Manufacturer ❑Industry Standard O Professional Engineer <br /> ❑Other(Spec6) <br /> 'Fest Method Used: X Pressure O vacuum 0 Hydrostadc <br /> 0 Outer(Spec) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution:0-15 PSI <br /> Piping Ittut#I Piping Ran 1#2 Aping 17uu# Piping Run# <br /> Piping MaterjaL- Poly Poly <br /> Piping Maoufanntrer: OPW/Entviron OPWITnVirou <br /> Piping Diameter: 1.5 1.5 <br /> Length of Piping Run: 220 220 <br /> Product Stored_ Premium <br /> Method and location of Test boot Test boot Test moot Test boot <br /> i in -nut isolation: <br /> Wait time between applying <br /> press))re/vacuum/water and 5 rain 5 min 5 min S min <br /> startin test: <br /> Test Start Time: <br /> Initial Reading(RI): <br /> Test End Tim: <br /> Final Rcading(Rr): <br /> Test Duration: 1 Hour I Hour 1 Hour 1 Hour <br /> Cbange in Reading(RF-R& <br /> Pass/Fail Threshold or 0 drop 0 drop 0 drop 0 drop <br /> Criteria: <br /> Test Result; ❑ Pass x Fail n Pass s Fail [I Pss a0 Fall Q Pass O Fuii <br /> Comments—(include i5orrnatlon on r irs mads riot to resting and recommended allow-up for failed tests) <br /> Unable to seal test boot in UDC 9-10 line will build no pressure <br /> £'d 9L L0-VVZ-60i; 1SOlbQi�O�dd dZb:ZL 0 Z6 qac <br /> fi00 'd 80I09SHOZi 'OA XVI 'HNA SSHZ W0 Q00A WV 0080 QOM/0I0Z/00/W <br />