My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
3408
>
2300 - Underground Storage Tank Program
>
PR0517521
>
COMPLIANCE INFO 2010 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 3:39:19 PM
Creation date
5/7/2019 10:21:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2018
RECORD_ID
PR0517521
PE
2361
FACILITY_ID
FA0013484
FACILITY_NAME
FOOD 4 LESS FUEL CENTER*
STREET_NUMBER
3408
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16422011
CURRENT_STATUS
01
SITE_LOCATION
3408 MANTHEY RD
P_LOCATION
01
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
383
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S WRCB,January 2002 Page J of <br /> 7. UNb)t'R DISPENSER CONTAR04ENT TESTING <br /> Test Method Developed By' ❑UDC Manufacturer ❑Industry Standard X Professional Engineer <br /> Q Ocher(Specifj') <br /> Tcst Method Used: ❑Pressure ❑Vacuum, X Hydrostatic <br /> ❑Other(Specs y) <br /> Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 min <br /> UDC#1-2 UDC#34 UDC#5-6 TJDC#7-e <br /> UDC Manufachtrtsr: Environ Bravo Bravo Bravo <br /> UDC MateriaL Poly Fiberglass liber lass , FlberpJass <br /> UDC Depth: 31" 32" 32" 32" <br /> Height from UDC Bottom to Top 10" 20" ]Of" 9" <br /> of Hi t Pi Peuetra-don: <br /> Height from UDC Bottom to 4" 4" 4" 4" <br /> Lowest Electrical Penetration- 4 <br /> Condition of UDC prior to Dry DN Dry <br /> testing- <br /> Portion <br /> estis :Portion of VDC Tested ?"above Hi t PipingPenetration <br /> Does turbine strut down whcm <br /> UDC sensor detects liquid(both x Yes Cl No ❑NA x Yes Cl No ❑NA x Yes 0 No 13NA x Yes ❑No ❑NA <br /> induct and waterV, <br /> Turbine shutdown response time <br /> Is system programmed for fail- x Yes in No ❑NA x Yes ❑No D NA x Yes Q No ❑NA x Yes Q No ❑NA <br /> safe shutdown?' <br /> Was fail-safe verified to be ❑Yes x No ❑NA ❑Yes x No [INA a Yes x No DNA ❑Yes x Ne ❑NA <br /> operational? <br /> Wait time between applying <br /> pressure/vacuum/water and. 5 min 5 mill 5 min 5 <br /> starting test <br /> Test Start Time: 2:30 71:53 <br /> Initial Re (R4): .00" 00" .00" .001, <br /> Test End Time: 3:30 1223 <br /> Final Reading(Rr); <br /> 00 .00 <br /> Test Duration: 30 min 30 mm 30 min 30 min <br /> Change in Readki (RF-R,): .00 .00 <br /> Pass/Fail Threshold or Criteria: 005/30 miD .005/30 min .005/30 min _005/30 min <br /> Test Result: x Pass D Fall ❑ Pass x A90 ❑ Pass x Fail x Pass ❑)Fall <br /> Was sensor removed for testjand <br /> x Yes ❑No D.NA x Yes . G No ❑NA x Yes ❑No QNA x Yes ❑No [--INA![ODJNA <br /> [Was sensor properly replacex Yes ❑No ❑NA x Yes C No ❑NA x Yes ❑No CNA x Yes Q No <br /> verified functional after testi <br /> Comments--(include information on repairs made prior to te5t!s,E, and recommended fouaw-up for failed tests) <br /> t If the entire depth of the UDC is not tested,specify how much was tested. If the answer to My of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br /> d 9LL0- L-60Z 1S3.LVG jO=HV dZj7i7_b OL ZL qej <br /> 801OH96OZi A NJ SSH'I U Q00j 11V 16 :80 HKIOZ/00/M <br />
The URL can be used to link to this page
Your browser does not support the video tag.