My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
681
>
2900 - Site Mitigation Program
>
PR0544431
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 3:06:32 PM
Creation date
5/7/2019 2:33:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0544431
PE
2952
FACILITY_ID
FA0006730
FACILITY_NAME
CLAUDE C WOOD CO
STREET_NUMBER
681
Direction
E
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04905002
CURRENT_STATUS
02
SITE_LOCATION
681 E LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Closure Report I <br /> Former Claude C.Wood Construction Yard,681 East Lockeford Street,Lodi,CA November 16, 1999 <br /> 1.0 INTRODUCTION <br /> SECOR International Incorporated (SECOR)has prepared this Site Closure Report on behalf of <br /> Mr. Robert Taylor with Al Johnson Construction Company for the Claude C. Wood Construction <br /> Yard located at 681 East Lockeford Street, Lodi, California(the Site, Figure 1). The document <br /> has been prepared at the request of Ms. Wendy Cohen with the Regional Water Quality Control <br /> Board, Central Valley Region(RWQCB) to clarify the completion of a underground storage tank <br /> (UST) removal and soil excavation project at the site in October 1994 at the Site. This closure <br /> report will review the history of the discovery of a diesel release from the aboveground tank <br /> farm, waste oil UST removal, soil excavation, confirmation soil sample collection and analyses, <br /> and present the results of the analytical data. <br /> The following documents were used in preparation of the report: <br /> Final Report Covering Spoil removal, J Hunter& Associates, July 1993 <br /> Work Plan for Diesel Contaminated Soil Remediation, ASTA Construction,August 17, <br /> 1994 <br /> Report For Waste Oil Tank Removal and Diesel Contamination Soil Remediation <br /> ASTA Construction, December 1994 <br /> AI-ClosureRpt.RPT.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.