Laserfiche WebLink
Samples will be taken from the bucket by Wm Hunter and Associates <br /> and transported by them to an approved lab under chain of custody. <br /> Sampling and analyses will follow LUFT guidelines . Samples will <br /> be tested for TPH-D&G, and BTE&X . We propose to take sidewall and <br /> bottom samples from the tank excavation, along the bottom of the <br /> pipeline and pump island excavations . Samples will be taken equi- <br /> distant around the perimeter and along the length of the bottom of <br /> the excavations at the direction of SJHS/EHD representative on- <br /> site . We propose 4 samples (8 discrete to form the 4 composites) <br /> from the spoil pile at the direction of the SJPHS/EHD representa- <br /> tive . The total number of samples may be altered if conditions or <br /> volumes warrant a change . <br /> 8 . Backfill : Backfilling will be done by Jim Thorpe Oil personnel . <br /> Backfill material will be Lodi top soil supplied by the owner. <br /> Compaction will be to the City of Lodi specifications . Compaction <br /> reports will be submitted with the Wm. Hunter & Assoc. final re- <br /> port . <br /> 9 . Work Schedule: Because of the location, the need to complete the <br /> excavation and backfill and install a new above ground fueling <br /> station before the rainy season is upon us, it is necessary to be- <br /> gin the over excavation as soon as possible . The owners are re- <br /> questing permission to continue excavation and clean-up procedures <br /> Monday 12/4/95 . Excavation should be completed within two days . <br /> Sample analyses results should be ready for review within 2 weeks . <br /> 10 . Health and Safety Plan: Attached. <br /> Respectfully submitted, <br /> JIM TH PE OIL, INC <br /> dba - UCTION <br /> Richard Thorp <br /> President <br /> 3 <br />