Laserfiche WebLink
SWRCB, January 2002 Page j of <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer T Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: lr Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: <br />Piping R# / Piping Run # 2- <br />Equipment Resolution: <br />Piping Run # Piping Run # <br />Piping Material: rub �, r� <br />G I ti r vl t?) 4, nC <br />Piping Manufacturer: T-oim I Coil <br />Piping Diameter: � <br />z <br />Length of Piping Run: S / <br />Sv <br />Product Stored: (A,1 i ec, de d <br />r{t-n i rn <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test jo r+, <br />10 Yn 0, h <br />Test Start Time: Lt, C— <br />�t i. GGA <br />Initial Reading (Rj): S <br />ti t <br />Test End Time: ' 3 U <br />Final Reading (RF): <br />' <br />Test Duration: 3 �-,h , Vj <br />V t'h , h <br />Change in Reading (RF-Ri): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result. Pass []Fail <br />Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />