My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
3408
>
2300 - Underground Storage Tank Program
>
PR0517521
>
COMPLIANCE INFO 2002 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 3:00:07 PM
Creation date
5/8/2019 1:59:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2006
RECORD_ID
PR0517521
PE
2361
FACILITY_ID
FA0013484
FACILITY_NAME
FOOD 4 LESS FUEL CENTER*
STREET_NUMBER
3408
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16422011
CURRENT_STATUS
01
SITE_LOCATION
3408 MANTHEY RD
P_LOCATION
01
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page j of <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: ❑ Piping Manufacturer T Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: lr Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: <br />Piping R# / Piping Run # 2- <br />Equipment Resolution: <br />Piping Run # Piping Run # <br />Piping Material: rub �, r� <br />G I ti r vl t?) 4, nC <br />Piping Manufacturer: T-oim I Coil <br />Piping Diameter: � <br />z <br />Length of Piping Run: S / <br />Sv <br />Product Stored: (A,1 i ec, de d <br />r{t-n i rn <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test jo r+, <br />10 Yn 0, h <br />Test Start Time: Lt, C— <br />�t i. GGA <br />Initial Reading (Rj): S <br />ti t <br />Test End Time: ' 3 U <br />Final Reading (RF): <br />' <br />Test Duration: 3 �-,h , Vj <br />V t'h , h <br />Change in Reading (RF-Ri): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result. Pass []Fail <br />Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.