Laserfiche WebLink
SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Page 4 of 7 <br />Test Method Developed By: ❑ Sump Manufacturer Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: ❑ Pressure ❑ Vacuum ;F Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: ( 1; L <br />Equipment Resolution: <br />Sump # Sump # 2— <br />Sump # Sump # <br />Sump Diameter: �, <br />Sump Depth: tr <br />0 t <br />Sump Material: El, he r 6 1,1 <br />Height from Tank Top to Top of <br />�t <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: L <br />t` / e,, n <br />Portion of Sump Tested' Fri 1 <br />Jam,, f ( <br />Does turbine shut down when <br />sump sensor detects liquid (both Y Yes ❑ No ❑ NA <br />Q Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />product and water)?` <br />Turbine shutdown response time I U Sc C_ <br />!v Se . <br />Is system programmed for fail-safe Yes ❑ No ❑ NA <br />� Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />shutdown?* <br />Was fail-safe verified to be Yes ❑ No ❑ NA <br />opera ional?* <br />X Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: G ,m t^ <br />I V ni n <br />Test Start Time: <br />Initial Reading (R,): U 1 <br />Test End Time: <br />Final Reading (RF): .001 <br />L�Cj <br />Test Duration: 3 61 . , r., <br />C� r►, , �, <br />Change in Reading (RF -R,): & <br />Pass/Fail Threshold or Criteria: .002 - <br />00ZTest <br />Test Result: E Pass ❑ Fail <br />Pass ❑ Fail <br />❑ Pass ❑ Fall <br />❑ Pass ❑ Fail <br />Was sensor removed for testing? �Yes ❑ No ❑ NA <br />)IYes ❑ No [INA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />Was sensor properly replaced and VYes 11No ❑ NA <br />((Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />verified functional after testin ? <br />Comments — (inc <br />0PV )10.h <br />G/ <br />on repairs made prior to testing, and recommended <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />