Laserfiche WebLink
7� <br />Dec 31 02 11:03a Fra n Hill 5596 4� <br />67 ; Yr p.9 <br />_ �1AR 2 e 2003 <br />SWRCB, January 2002 Etd���r,0124�Page of <br />6. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer y Industry Standard Professional Engineer <br />0 Other (Spec) <br />Test Method Used: 0 Pressure ❑ Vacuum JE Hvdrostatic <br />❑ Other (Specifv) <br />Test Equipment Used:L A 1 1,/ F L Lquipment Resolution: <br />Sump 9 Sump # Sump k Sump # <br />Sump Diameter <br />1 3 j // <br />Sump Depth: <br />C-0 <br />Sump Material: <br />EJ),- r <br />Height from Tank Top to Top of <br />i <br />Highest Piping Penetration: <br />�� <br />Z <br />Height from Tank Top to Lowest <br />�� <br />Electrical Penetration: <br />2 <br />Condition of sump prior to testing: <br />Portion of Sump Tested' <br />F,,, <br />j <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />I Yes ❑ No ❑ NA <br />Q Yes ❑ No ❑ NA <br />❑ Yes 0 No C NA <br />C Yes 0 No ❑ NA <br />roduct and water)?f <br />Turbine shutdown response time <br />Q) Sec_ <br />10 Sc -e. <br />Is system programmed for fail-safe <br />shutdown?* <br />t Yes 0 No ❑ NA <br />t Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />0 Yes ❑ No ❑ NA <br />Was fail-safe verified to be <br />o erational?f <br />!O Yes 0 No ❑ NA <br />[E Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />0 Yes ❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />' <br />test: <br />G ,m) h <br />i U fn- h <br />Test Start Time: <br />G V <br />: G <br />Initial Reading (Rt): <br />'001 <br />. Uo 1 <br />Test End Time: <br />36 <br />J <br />Final Reading (RF): <br />• DU <br />Lid j <br />Test Duration: <br />30 w r, <br />3 O <br />Change in Reading (RF-Ri): <br />& <br />& <br />Pass/Fail Threshold or Criteria: <br />. 0o2- <br />oo <br />Test Result: <br />Pass ❑ Fail <br />Pass ❑ Fail <br />0 Pass ❑ Fail <br />E Pass ❑ Fail <br />Was sensor removed for testing? <br />*Yes 0 No ❑ NA <br />'Yes 0 No ❑ NA <br />0 Yes 0No ❑ NA <br />❑ Yes ❑ No [INA <br />Was sensor properly replaced and <br />y es ❑ No ❑ NA <br />Yes ❑ No ❑ NA <br />❑Yes ❑ No DNA <br />❑Yes 0 No ❑ NA <br />verified functional after testin ? <br />Comtnents —(include information on repairs made prior to testing, and recommended, <br />DPS✓ &T,t, 6 rvr,* <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to Any of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />