Laserfiche WebLink
Dec 31 02 1 1 : 02a Fra. n Hi 11 5596 467 ��'�� F. 8 <br />MAR 2 6 2OO .17 <br />SWRCB, January 2002 Page ) of 7 <br />S grrf) ARV PTPF. TF.STTNr C�"4.IC1H�V��y �Y � ,Z VICe' <br />Test Method Developed By: ❑ Piping Manufacturer i industry S777 ❑ Professional Engineer <br />C Other (Specify) <br />Test Method Used: t Pressure 0 Vacuum 0 Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: i Equipment Resolution: <br />"" Piping n# `Piping Run # 2 Piping Run Piping Run #: <br />Piping Material: pvi •H 41,111h c,rc (, it t4 ✓ vJ ? "t►�e <br />Piping Manufacturer: <br />T-oCay L <br />C' <br />Piping Diameter: <br />2-,t <br />2" <br />Length of Piping Run: <br />S <br />Sd t <br />Product Stored: <br />(A n i tc, de C <br />Yip n ; in ►rt <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />t) 'M <br />)C) en , ►� <br />Test Start Time: <br />y ;G1J <br />it ' Cv <br />Initial Reading (R,): <br />5 P <br />51 <br />Test End Time- <br />'19 10 <br />4, 3U <br />Final Reading (RF): <br />S <br />65 <br />Test Duration: <br />k",V1 <br />V C --h, i <br />Change in Reading (RF-Rj): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />Pass = Fait <br />Pass 0 Fail <br />0 Pass 0 Fail <br />0 Pass 0 Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />