Laserfiche WebLink
JAN -21 -2003 -TUE 01:19 PM <br />Dec 31 02 11.02a rranzen Hill 55��d814B7 <br />S WRCB, January 2002 <br />S CFf`f1N71dR`N PYPTi' TFCTTN('' <br />P 004 <br />P - <br />Page 3 of <br />Test Method Developed By: ❑ Piping Manufacturer industry Standard ❑ Professional Engineer <br />G Other (Specify) <br />Test Method Used: C Pressure 0 Vacuum C Hydrostatic <br />0 Other (specify) <br />Test Equipment Used: <br />Piping Run 9 / Piping Run # 2 <br />Piping Material: 11 P140 elc, 1,- 12&lV to r q ih1 atnC <br />Equipment Resolution: <br />Piping Run ti Piping Run ## <br />Piping Manufacturer: <br />'To" I CoM �n <br />Piping Diameter: <br />2-' <br />Length of Piping Run: <br />5-61 5'(j t <br />Product Stored: <br />Lt ►11 ec, de d ret," i'in r1 <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />U ri• I U rn In <br />Test Start Time: <br />i t , ' [;v <br />Initial Reading (R,): <br />06 t' <br />Test End Time: <br />' 3 U <br />Final Reading (RF): <br />S 5 <br />Test Duration: <br />Change in Reading (RF -R,): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />Pass 0 Fail Pass D Fail <br />O .Pass ❑ Fail <br />0 Pass O Fail <br />Comments — (include information on repairs made prior to testin& and recommended follow-up for failed tests) <br />e _— <br />