Laserfiche WebLink
JAN -21 -2003 -TUE 01;19 PM <br />Dec 31 02 11;Q3a Franzen Hill <br />SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />55:,.,481467 <br />p.9 <br />Page 4 of - <br />Test Method Developed lay; ❑Sump Manufacturer Industry Standard ❑ professional Engineer <br />❑ Other (Specify) <br />Test Method Used: C Pressure ❑ Vacuum JB Hydrostatic <br />0 Other (Specify) <br />Test Equipment Used: LAD 1,1F L <br />Sump # Sump # 2— <br />Sump Diameter: <br />Equipment Resolution: <br />Sump # Sump # <br />Sump Depth: <br />(�l <br />01 <br />Sump Material, <br />r! �� <br />Height from Tank Top to Top of <br />Highest Piping Penetration; <br />7 �� <br />2 �� <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />L <br />/ e c, ti <br />Condition of sump prior to testing: <br />Portion of Sump Tested <br />.,, <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />roduct and water}? <br />If Yes ❑ No DNA <br />Q Yes ❑ No DNA <br />❑ Yes ❑No DNA <br />C Yes O No 0 NA <br />Turbine shutdown response time <br />iU Tee_ <br />10 Sit . <br />Is system programmed for fail-safe <br />shutdown?' <br />k Yes 0 No ❑ NA <br />tYes 0 No 0 NA <br />❑ Yes ❑ No DNA <br />0 Yes C No U NA <br />Was fail-safe verified to be <br />operational?' <br />Yes ❑ No ❑ NA <br />I$ Yes ❑ No ❑ NA <br />❑ Yes 0 No ❑ NA <br />Q Yes 0 No DNA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />(.+ ✓► i y� <br />V inti r <br />Test Start Time: <br />Initial Reading (Rj): <br />Test End Time: <br />L30 <br />Final Reading (RF): <br />TestDuration;0 <br />3 Q <br />Change in Reading (RF-Rj): <br />(k <br />Q <br />Pass/Fail Threshold or Criteria: <br />, 0o2- <br />r , <br />Test Result: <br />E Pass 0 Fail <br />Pass ❑ pall <br />❑ Pass 0 Fail <br />0 Pass ❑ Fail <br />Was sensor removed for testing? <br />[ i Yes ❑ No DNA <br />OrYes O No DNA <br />❑ Yes DNo ❑ NA <br />_OYes ON, DNA <br />Was sensor properly replaced and <br />verified functional after testing? <br />VYes 0 No a NA <br />Yes 0 No ❑ NA <br />O Yes C No 0 NA <br />0 Yes 0 No D NA <br />COMM ents — (include information on repairs made prior to resting, and recommended <br />0PW PI'D•n6 Cjr Rug�-* <br />1 If the entire depth of the sump is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk (") is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />