My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 1997 - 2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
BILLING 1997 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 12:40:34 PM
Creation date
5/10/2019 4:17:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
1997 - 2005
RECORD_ID
PR0506504
PE
2361
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
01
SITE_LOCATION
1100 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQU . OUNTY ENVIRONMENTAL HEALTHWARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- PAGE 1 <br /> TYPE OF ACTION ❑ 1.NEW PLAN A 2.CHANGE OF INFORMATION Mot. <br /> PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. M02. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) EA QC0 4 <br /> tt,, M03 <br /> FACILITY NAME - and�DC.I- <br /> FACILITY SITE ADDRESS CITY Mos. <br /> 41 a3 u,�� a q �o r1-�a t2c>�c1 Moo ck-� n <br /> II. EQUIP NT TESTING-AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06. <br /> accordance with the equipment manufacturers'instructions,or annually,whichever is more frequent. Such work must be performed by qualified personnel. <br /> M07. <br /> MONITORING EQUIPMENT IS SERVICED ❑ 1.ANNUALLY V'99.OTHER(Specify): <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M10. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: Xa.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM M11. <br /> PANEL MANUFACTURER: _,< Mt2. MODEL#: L.S 3 ��• M13. <br /> LEAK SENSOR MANUFACTURER: V Pn Pi/ Mla. MODEL#(S): Mts. <br /> 2.AUTOMATIC TANK GAUGING(ATCd)SY�TEM USED TO MONITOR SINGLE WALL TANK(SM17. <br /> l <br /> PANEL MANUFACTURER: P PIS R00- MI6. MODEL#: �L`J JJLJ <br /> IN-TANKPROBE MANUFACTURER: `f,Pe(jD. i2QC - M16. MODEL#(,S): M19. <br /> LEAK TEST FREQUENCY: Nfa.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY M`o <br /> f <br /> e.OTHER(Specify): Mgt. <br /> ❑ d.MONTHLY ❑ Y)� <br /> M22. M23. <br /> PROGRAMMED TESTS: Ka.0.1 g.p.h. ❑ b.0.2 g.p.h. El c.OTHER(Specify): <br /> M-14. <br /> El INVENTORY RECONCILIATION Ela.MANUAL PER 23 CCR§2646 Elb.STATISTICAL PER 23 CCR§2646.1 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: F1 a.36 HOURS ❑ <br /> b.60 HOURS M s. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> M26. M27. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) M.6 <br /> ❑ <br /> 99.OTHER(Specify): <br /> V. PIPE MONITORING <br /> M30.. <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(S)/TRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT 15: a.DRY [Ib.LIQUID FILLED ❑ c.UNDER PRESSURE ❑ d.UNDER VACUUM <br /> M31. <br /> / <br /> PANEL MANUFACTURER: L E �/ M32. MODEL#: M33.'3S� <br /> M34. MODEL#(S): 73dLJ M35. <br /> LEAK SENSOR MANUFACTURER: r <br /> M36. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. <br /> a.YES ❑ b.NO <br /> M37. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? a.YES ❑ b.NO <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK ISJ E ECTEDM39. <br /> MLLD MANUFACTURER(s): <br /> Jk(i n M3S MODEL#(S):M31- <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> Mao. MODEL#: M41. <br /> ELLD MANUFACTURER: <br /> M42. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO <br /> M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN. ❑ <br /> a.YES ❑ b.NO M44 <br /> ❑ 4.INTEGRITY TESTING M45. M46. <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED" M47. <br /> -Requires agency approval "Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25261.5(6x3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) M46 <br /> ❑ <br /> 99.OTHER(Specify) <br /> 07/23/03 <br /> SJCEHD-d(07/03)-1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.