My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 1997 - 2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
BILLING 1997 - 2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 12:40:34 PM
Creation date
5/10/2019 4:17:21 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
1997 - 2005
RECORD_ID
PR0506504
PE
2361
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
01
SITE_LOCATION
1100 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - PAGE 2 <br /> VI. DISPENSER MONITORING <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Myo. <br /> 1.CONTINUOUS ELECTRONIC MONIIT/ORIR/IN—G OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: (/riG JIJ )QiT// M" MODEL#: / .� ✓ �.� M52. <br /> LEAK SENSOR MANUFACTURER: 1�_Q152C eV-r MSB. MODEL#(S): �J97>my M54. <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? —9 a.YES ❑ b.NO Mss. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? a.YES ❑ b.NO M56. <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? a.YES ❑ b.NO M57. <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: M58. MODEL#(S): M <br /> 3.VISUAL MONITORING DONE: X a.DAILY El b.WEEKLY(Requires agency approval) Mh6o0. <br /> . <br /> ❑ 4.NO DISPENSERS <br /> M61. <br /> ❑ 99.OTHER(Specify) <br /> VII. ENHANCED LEAK DETECTION <br /> 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK Myo. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) M80. <br /> 1. THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 7/1/2004) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> Mel <br /> 99. El OTHER(Specify): <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br /> By July 1,2004,this facility will have a"Designated UST Operator"who has passed the operator exam administered by the International Code Council(ICC). By July <br /> 1, 2004, and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems This <br /> training will include,but is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> > The facility employee's role with regard to the leak detection equipment. <br /> > The facility employee's role with regard to spills and overfills. <br /> > Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after July 1,2004,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): Mss. <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF 7/1/2004,THE"DESIGNATED UST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION— <br /> FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR§2715(b). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> OWNE E 0 �RE , REPRESENTING DATE: M91. <br /> ❑Owner M90. `� <br /> ❑Operator / — J <br /> zg� Mv2. OWNER/OPERATOR TITLE: M93. <br /> O ER/OPERATOR NAME(print): <br /> (Agency Use Only) This plan has been reviewed and: ❑Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: <br /> Comments/Special Conditions: <br /> 07/23/03 <br /> SJCEHD-d(07/03)-3/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.