Laserfiche WebLink
S W RC B, January 2002 <br /> 6. PIPING SUMP TESTING Page 4 of <br /> Test Method Developed By: ;Sump Manufacturer Industry Standard Professional Engineer <br /> Other(.4pec ) <br /> Test Method Used: i.; Pressure Vacuum <br /> Hydrostatic <br /> Other(Spec�j <br /> Test Equipment Used: 1'4I JWe1 G-Q+fIL (_. T,,,, i �„ <br /> ry- Equipment Resolution: <br /> Sump# Sump# Z Sump# 3 Sump# <br /> Sump Diameter. �� 4 p t, � � r <br /> Sump Depth: C'/2.' SOL" & / „ <br /> Sump Material: ��r Ile ,14, 1 s �� lut � 4 ss <br /> Height from Tank Top to Top of If <br /> l�sf �=, <br /> 11 <br /> Highest Piping Penetration: 2-2- t 21 1 t <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: 34 3& <br /> Condition of sump prior to testing: jQ r y D r pry <br /> Portion of Sump Tested' lac 4-�v <br /> Does turbine shut down when <br /> sump sensor detects liquid(both es ❑No ❑NA1'es ❑No ❑NAYes ❑No ElNA ❑ es o LlNA <br /> product and water)?* <br /> Turbine shutdown response time 3_S� <br /> Is system programmed for fail-safe <br /> shutdown?* es ❑No ❑NA 96tS ❑No ❑NA /6Yes ❑No ❑NA ❑Y ❑No ❑NA <br /> Was fail-safe verified to be <br /> operational?* ❑Yes l^o ❑NA ❑Yes IW_4o ❑NA ❑Yes "o ❑NA ❑Y ❑No ❑NA <br /> Wait time between appLYmg <br /> pressure/vacuum/w$tesarfd starting <br /> test: /0 4 r�,�u�t� d���ryiw��• <br /> Test Start Time: <br /> Initial Reading(Rr): }�-ins-� C <� F�s4- (dl�(� <br /> Test End Time: /v: Z U -2— 3 <br /> Final Reading(110: Fcys �.+�c �;c -/-CryG4r 4-Cwteg <br /> Test Duration: 30r�'.e.*u f tS <br /> 3D r�t,zevt 4-'e5 30 1e e-t4" �-11'5 <br /> Change in Reading(RF-R,): ^�d r ,X Ns Ciµ N e e t,M yt <br /> Pass/Fail Threshold or Criteria: 005 3,1 r a d r`r_� <br /> Test Result: Pass ❑ Fail Pass ❑ Fail Pass ❑ Fail ❑ Pass Fail <br /> Was sensor removed for testing? Yes 1-1 No IJNA es 1 .No ❑NA Yes []No [-INA 1 Yes ❑No NA <br /> Was sensor properly replaced and <br /> verified functional after testing? es []No [INA des No f 1 NA Yes No NA L. ['No <br /> Comments—(include information on repairs made prior to testing and recommended follow up for failed tests) <br /> If the entire depth of the sump is not tested, specify how much was tested. If the answer to arty of the questions indicated with an <br /> asterisk(*) is"NO"or"NA", the entire sump must be tested. (See SWRCB LG-lb0) <br />