My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
COMPLIANCE INFO 2006 - 2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2019 9:44:41 AM
Creation date
5/10/2019 4:24:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2011
RECORD_ID
PR0506504
PE
2361
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
01
SITE_LOCATION
1100 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S WRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT C TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry StandardProfessional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: C,-,(,J,,,.ie je tL C 4 715-4r Equipment Resolution: z j <br /> UDC# L II UDC#2 5 UDC# 3 E UDC# 7 f L <br /> UDC Manufacturer: Wes }Y. u/r +eWI <br /> UDC Material: <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: 12-11 <br /> Height from UDC Bottom to '?I p t <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> testing: <br /> Portion of UDC Tested w c, L,.Ip ! y,L W � <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both 'Yes ❑No ❑NA ?Yes ❑No ❑NA Yes ❑No ❑NA �1'es ❑No ❑NA <br /> product and water)?* /\ <br /> Turbine shutdown response time s e .3 5 c <br /> Is system programmed for fail- <br /> safe shutdown?* es ❑No ❑NA es ❑No ❑NA <br /> 4es ❑No ❑NA ,'Yes ❑No ❑NA <br /> Was fail-safe verified to be <br /> opera ional?* ❑Yes __^o ❑NA ❑Yes ,5-No ❑NA ❑Yes ;ief4o ❑NA ❑Yes �io ❑NA <br /> Wait time betwee 1 ing <br /> pressure/vacu ater d <br /> starting test /0/'-( +i.l ca-'. o/--1 41 u <br /> Test Start Time: /Y/-' o S / <br /> Initial Reading Ri): ; rc L i r ✓ ( - i ,c(G r e v c <br /> Test End Time: ! i: 3 Z l Z z /2, <br /> Final Reading RF): ✓�f.� Cnc �z �C•,c } c�.��l '.yt�" C.vc P <br /> Test Duration: o r-� S r (�•r, .fid rte/w•a�?L-r5 <br /> Change in Reading(RF-Ri): Nu c 14.�.»a ova Iv Ej ��.,. .� <br /> Pass/Fail Threshold or Criteria: oe, 3o r /-" /,v a s' o r�µ- no <br /> o f 3o r o s a r <br /> Test Result: K Pass ❑ Fail V Pass ❑Fail Pass ❑Fail Wass ❑Fail <br /> Was sensor removed for testing? es ❑No ❑NA es ❑No ❑NA Xyes ❑No ❑NAes ❑No ❑NA <br /> Was sensor properly replaced and es EJ No El NA �'es El No El NA '`Yes El No ❑NA JCYes ❑No ❑NA <br /> verified functional after testing? <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> If the entire depth of the UDC is not tested, specify how much was tested. If the answer to my of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.