My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1100
>
2300 - Underground Storage Tank Program
>
PR0506504
>
COMPLIANCE INFO 2010 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 11:22:26 AM
Creation date
5/13/2019 8:45:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2018
RECORD_ID
PR0506504
PE
2361
FACILITY_ID
FA0007464
FACILITY_NAME
MAIN STREET ARCO AM PM*
STREET_NUMBER
1100
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
22119062
CURRENT_STATUS
01
SITE_LOCATION
1100 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
296
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A,CDEH,August 2003 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer xlndustry Standard C Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: s Pressure E Vacuum E Hydrostatic <br /> _ <br /> 12 Other(Sped) <br /> Test Equipment Used:0-15 PSI Gauge Equipment Resolution.1/2psi <br /> Piping Run# 4- Piping Run piping Run# 1 Piping Run# <br /> Piping Material: _ REP � FZ� <br /> Piping Manufacturer: t'10-0t A <br /> Piping Diameter: �� e <br /> Length of Piping Run <br /> Product Stored: <br /> Method and location of <br /> piping-nm isolation: T-'�_5Y <br /> Wait time between applying - <br /> pressure/vacuum/water and i <br /> starting test: ^y <br /> Test Start Time: �- <br /> - <br /> Initial Reading(RI): <br /> Test End Time RA D <br /> Final Reading(Rt): v S� <br /> i <br /> Test Duration: r __ <br /> Changc in Reading(RF-RST ti tip " U - <br /> Pass/Fail'Threshold or _a w <br /> Criteria: <br /> Test Result: �Q Pass q:Ftiit J� PEisa p Fail �P'arsS ❑Fail E Pass CJ f ail <br /> Comment's-(include i farmation on repairs Matkprior to testis and recommends follow-up on fcrilcd tests)tALIM <br /> ��. PmviRoNle 'T <br /> ��_ DEPA i l l �— <br />
The URL can be used to link to this page
Your browser does not support the video tag.