Laserfiche WebLink
A,CDEH,August 2003 Page of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer xlndustry Standard C Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: s Pressure E Vacuum E Hydrostatic <br /> _ <br /> 12 Other(Sped) <br /> Test Equipment Used:0-15 PSI Gauge Equipment Resolution.1/2psi <br /> Piping Run# 4- Piping Run piping Run# 1 Piping Run# <br /> Piping Material: _ REP � FZ� <br /> Piping Manufacturer: t'10-0t A <br /> Piping Diameter: �� e <br /> Length of Piping Run <br /> Product Stored: <br /> Method and location of <br /> piping-nm isolation: T-'�_5Y <br /> Wait time between applying - <br /> pressure/vacuum/water and i <br /> starting test: ^y <br /> Test Start Time: �- <br /> - <br /> Initial Reading(RI): <br /> Test End Time RA D <br /> Final Reading(Rt): v S� <br /> i <br /> Test Duration: r __ <br /> Changc in Reading(RF-RST ti tip " U - <br /> Pass/Fail'Threshold or _a w <br /> Criteria: <br /> Test Result: �Q Pass q:Ftiit J� PEisa p Fail �P'arsS ❑Fail E Pass CJ f ail <br /> Comment's-(include i farmation on repairs Matkprior to testis and recommends follow-up on fcrilcd tests)tALIM <br /> ��. PmviRoNle 'T <br /> ��_ DEPA i l l �— <br />