Laserfiche WebLink
ACDEH,August 2043 Page—of <br /> 6. PIPING SUW TESTING <br /> Test Method Developed By: Q Sump Manufacturer D Industry Standard x Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure ❑Vacu'um xHydrostatic �w� <br /> 0 Other(Spee{fy) _ <br /> Test Equipment Used:In-Con TS-STS Equipment Resolution:+_.002" <br /> Sump# '—' ) Sump# -IM Sump#1. Sump# <br /> Stmip Diameter: e4V" s" <br /> Sump Depth: p�"` <br /> Sulmp Material: - F fpPep F'ep <br /> Hcight from Teuik Top to Top of (— T yi <br /> r'r � <br /> 11, -lest Piping Penetration-—— <br /> Height from Tank Top to Lowest <br /> Electrical Peuetradtion: <br /> Condition of sump prior to testing;: 1� , <br /> Depth of Sump Tested i i <br /> Does turbine sb.ut down when <br /> sump sensor defeats liquid{both Yrs 0 No DNA Yes 0 No DNA Ayes C1 No Li NA D Yes D No D NA <br /> product and water?' <br /> Tarbine shutdo%am response time <br /> Is system programmed for failsafe <br /> shutdown?` Y es ❑No NA Yes ❑No 0 NA Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> Was fail-safe verified to be <br /> operational?* 0 Yes ktNo E NA 7 Yes hNo 0 NA U Yes 44o DNA C Yes 0N 0 NA <br /> _.._...v '' <br /> Wait time between applying <br /> pressurelvacuum/water and starting <br /> test: _ <br /> Test Stext` rime: - <br /> Initial Reading(R4): <br /> Test End Tune <br /> Final Reading tI2F): ^ l L _ Y I t) S <br /> Test Duration: , I �is—A <br /> Change in Reading(RE-R4): Ook 1 m <br /> Pass/Fail Threshold or Criteria: � , � �(X!� 1�11 <br /> Test Result- Pass 13 Fail WTOSS 0 Fail � 9 Pass 0 Faa 0 Pass �. O bail <br /> Was sensor removed far testing? L'Yes 0 No 0 NA A*_,Yes O No DNA^ Eyes O No DNA C Yes 0 No CNA <br /> Was scnsor properly replaced and7 <br /> voed 1 after tes ' f W0 Yes No 0 NA -C Yes 0 No ❑ <br /> wNA -I Yes ,'3 No 0 NA 0 Yes D No 0 NA <br /> Comr21ent8—(include rn orrr�crti�n orr rep�ri�s made p�for to te'tin and recommended fulln�r failed tests) m __ <br /> i v rcr� <br />