Laserfiche WebLink
❑ Check this box if tank gauging is used only for inventory control. <br /> F. In-Tank Gauging/SIR Equipment: ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ <br /> No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No` Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No' Was accuracy of system product level readings tested? <br /> ❑ 7 <br /> Yes ❑ No' Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No` Were all probes reinstalled properly? <br /> ❑ Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Com lete the followin checklist: <br /> ® Yes ❑ No' For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply <br /> ❑ N/A Simulated leak rate: ®3 g.p.h.; [30.1 g.p.h; C]0.21 g.p.h "Il'l" <br /> ❑ Yes ® No' Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes ❑ No' Was the testing apparatus property calibrated? <br /> 0 Yes ❑ No' For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> 1771 Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ® N/A <br /> ❑ automatically shut off if portion of the monitoring system is disabled or disconnected <br /> Yes 177 No` For electronic LLDs,does the turbine <br /> ® N/A <br /> 171 Yes ❑ No` For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> ® N/A <br /> ❑ Yes ❑ No' For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ® Yes ❑ No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: 2 out of 3 LDS PASSED <br /> 89 LD FAILED NEEDS REPLACED AND RETESTED ASAP . - <br /> HMC Will repair and retest 89 LD. <br /> 2/21/07 <br /> Monitoring System Certification <br /> Page 3 of 4 <br />