Laserfiche WebLink
RECEIVED <br /> jOht�rl44yat 7certlflcation <br /> UST Monitoring Site Plan <br /> ENVIROI L HEALT�SKS Main Street Arco 1100 S. Main Street Manteca CA 95337 <br /> PARTM <br /> . . . . . . . . . . . . . . . . . . . <br /> 91 . <br /> i <br /> ATG X X F O <br /> T <br /> A L X . . . . <br /> X P <br /> X X F O T <br /> A L X <br /> X P <br /> R7 <br /> F O T <br /> X X A L X . . . . ` <br /> X P . . . . <br /> . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .89. . <br /> . . . . . . . . I . . . . . KEY <br /> FF <br /> =ANNULAR <br /> . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . FILLS <br /> =TURBINE PROBE . . <br /> . . . . . . . . V=VAPOR . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . X=SUMP SENSOR . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . L=Leak Detector I . . <br /> M=Manway . . <br /> B=Brine Sensor <br /> I=Smart Sensor <br /> S=STP <br /> Date map was drawn:3/28/17. C=Floats&Chains <br /> E=E Stop <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification <br /> Page 4 of 4 <br /> 2/21/07 <br />