My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:34:29 AM
Creation date
5/15/2019 11:02:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> GROUP INC. <br /> Manufactures catalog cut sheet for the Universal overfill prevention valve is <br /> attached. Manufactures catalog cut sheets for the external audible/visual alarm <br /> is attached. Also, three(3) copies of drawing ESI (Electrical Site Plan) is <br /> attached showing the location of the external audible/visual alarm. <br /> 5. Manufacturer specification sheets were not submitted for the brine sensor equipment to <br /> be used for the vent underground/aboveground transition sump. Also, specify <br /> manufacturer and material of this sump. <br /> As the SWRCB has not yet approved any system for the continuous monitoring of <br /> the secondary containment using vacuum,pressure or interstitial liquid level <br /> measurement methods and we anticipate completing the installation of this UST <br /> system before the July 1, 2004 deadline (LG 162-1), the vent'vapor piping <br /> secondary containment shall be continuously monitored to detect the entry of <br /> product into the secondary containment via the liquid sensors in the piping sumps <br /> at the tanks(per H&S Code,sec. 25290.2(d). No brine or liquid sensor will be <br /> introduced into this UST systems vent/vapor piping at this time. <br /> Note however in the future, when the SWRCB approves the interstitial liquid level <br /> measurement method for double-walled vapor and vent piping the liquid level <br /> sensor would be an integral component/sensor of the TLS-250 monitoring system <br /> installed at this site. <br /> The containment sump to be used for the vent underground/aboveground <br /> transition sump will be "Bravo': The unit is fiberglass. A manufacturer catalog <br /> cut sheet is attached. <br /> This completes our response to your review comments. <br /> Respectfully, <br /> REL DESIGN GROUP,INC. <br /> O"LL Q, <br /> Brian Merfeld <br /> Job Captain <br /> cc: File <br /> attachments <br /> F:\PROJECT\Ik\1038.40\Docs\10384_EHD TANKS Plan Check#1 Response-Ltr.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.