Laserfiche WebLink
Project No. JB -314 <br />24 March 2003 <br />Page 5 <br />structures should be designed to meet current Uniform Building Code (UBC) <br />requirements to limit potential damage from ground shaking. <br />6.0 RECOMMENDATIONS <br />6.1 Earthwork <br />6.1.1 General <br />As previously stated, final grading plans were not available during preparation of <br />this report. We recommend that final grading plans be reviewed by our office <br />prior to starting the grading operations. <br />As previously discussed, our laboratory test results indicate the near -surface <br />clayey soils are highly expansive and could be subject to movements with <br />increased moisture content. These near -surface soils are not the best material for <br />support of foundations, floor slabs, and exterior flatwork/sidewalks in their <br />present state. To help reduce the potential for heaving clayey soils, we <br />recommend the kiosk subgrade soils be over -excavated a minimum of 2 feet <br />below the proposed footing elevation for the building areas, moisture -conditioned, <br />and recompacted in the foundation area and at least 5 feet beyond the structure <br />and exterior flatwork/sidewalk areas in plan view, if practicable. The depth of <br />over -excavation may be reduced by the depth of engineered fill placed at the site. <br />Deeper sub -excavation may be required depending on soil conditions encountered <br />during grading. Figure 8, Foundation Materials Under Building, presents the <br />details for over -excavating and replacing the soil with compacted, engineered fill <br />within the building limits. Compaction recommendations are discussed in Section <br />6.1.4 Fill Placement and Compaction. <br />To help reduce the expansion and shrinkage potential of the clayey soil and to <br />provide improved support for floor slabs, and exterior flatwork, we recommend <br />the supporting soils be a minimum of 12 inches of non -expansive compacted fill, <br />Class 4 material, lime -treated fill, or an approved equivalent placed on moisture - <br />conditioned, compacted fill. The non -expansive fill should extend at least 5 feet <br />beyond the building pad area and, where practicable, and/or 2 feet beyond <br />exterior flatwork, whichever is greater. <br />6.1.2 Site Clearing <br />All grading must be observed by our representative. It is especially important that <br />our representative be present during the demolition, stripping and scarification <br />process to observe whether undesirable materials are encountered. Loose, soft, <br />uncontrolled fill, or disturbed native soils must be removed from all structural <br />areas, beneath adjacent walks and slabs, beneath areas to receive fill, and <br />beneath areas to be paved. Excavations must extend at least 5 feet beyond the <br />Korbmacher Engineering. Inc. <br />