My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
INSTALL 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:34:29 AM
Creation date
5/15/2019 11:02:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2003
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LA R C H I T E C T U R E • E N G I N E E R I N G E N V I R O N M E N T A L S E R V I C E S <br /> GROUP INC. 1340 Arnold Drive, Suite 110, Martinez, CA 94553 Telephone: (925) 313-9700 Facsimile: (925) 313-9709 <br /> March 15, 2004 <br /> John W.Johnson <br /> Co-President Ms.Michelle Le <br /> Architect San Joaquin County-Environmental Health Department <br /> 304 East Weber Avenue,Third Floor <br /> Brien E Zita Stockton, CA 95202 <br /> Co-President ll ll <br /> Architect RE: Safeway Fueling Center#2707 MAR 1 6 2004 <br /> 6425 N.Pacific Avenue <br /> John B. Hicks Stockton, California EWh•-. 4 ,i.-i`i i rirALI H <br /> Vice President Final Equipment Modifications PERMIT/SERVICES <br /> Cecil R. Spencer Dear Ms. Le: <br /> Vice President <br /> After the meeting in your office Friday(3/12/04) Chase Jiannalone,the Safeway Project Manager, <br /> decided to eliminate all the equipment/components that had been installed up to this point to <br /> Regional Managers accommodate"future"hydrostatic or vacuum monitoring systems for the product,vapor and vent <br /> Jesse E.Macias piping secondary containment in order to meet his deadline to complete and open the fuel facility <br /> Roy W. Pedro next month. <br /> Alan K. Shimabukuro The brine reservoirs and transition sumps have been eliminated. The double wall Western Fiberglass <br /> John W. Strobel UST, dispenser, vent riser sumps and penetration fittings have been replaced with the previously <br /> Blythe R.Wilson approved single wall Western Fiberglass UST and dispenser sumps and the Bravo vent riser sump <br /> and penetration fittings.The PVC conduit between each tank's STP sump and fill/VR sump has been <br /> eliminated. <br /> Enclosed for your review and approval are the following: <br /> • 3-sets of revised plans. <br /> Please do not hesitate to call me if you have any questions. Your expeditious review and approval of <br /> these final changes will be greatly appreciated. Once I receive your approval I will forward a copy of <br /> the approved plans to the contractor. <br /> Respectfully, <br /> RHLo�/DEESSIGN GROUP,INC. <br /> Offices Za' a Gt <br /> ANAHEIM, CA Project Manager <br /> BELLEVUE, WA <br /> ca Stockton Fire Department-Kent Miller(2-sets of revised plans) <br /> CAMAS, WA Safeway-Chase Jiannalone <br /> MARTINEZ, CA Safeway-ToddParadis <br /> Safeway-Mark Ochs <br /> PETALUMA, CA Shields Harper-Gene Rotter <br /> file <br /> ROSEVILLE, CA <br /> enclosures <br /> SCOTTSDALE, AZ <br /> www.rhldesign.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.