Laserfiche WebLink
OHILLSIDE INSTALLATION CAUTION: DO NOT STRIKE THE TANK <br /> Tanks may be installed on moderately sloping terrain WITH STEEL BAR <br /> provided the slope does not exceed 10 degrees. The After backfill is brought to top of tank,it is recommended ry} <br /> downhill side must consist of native soil. Fill dirt is not that water or product be added as ballast until piping / <br /> permitted on this side to alter the grade of the slope. and final backfilling to grade is accomplished.When fill- <br /> The top of the tank must be below the surface of the ing with ballast or product, make sure the tank is ade- <br /> downhill side, and must be covered by material with quately vented. <br /> depths as stated in item 4. CAUTION—Do not ballast tank with water or product <br /> until backfill is even with top of tank(except as noted in <br /> wet hole procedure). <br /> The same material as specified in Item 3 must be used <br /> —III 100 to completely fill excavation. The backfill must be free <br /> of debris.Any blocks or bricks used as support material <br /> during piping must be removed prior to completion of <br /> backfilling. Safety measures, such as placing barri- <br /> cades until installation is complete, should be used <br /> III— III II— around the excavation site. <br /> III II = <br /> NOTE:If there is any reason to believe that water might enter the hole <br /> after installation,or if hole is in clay soil with poor drainage,anchoring <br /> is required. <br /> III II III III III = I 1 - I IIII_ I — O WET HOLE INSTALLATION <br /> II— I I II I—I I= Pump the water from the hole to maintain minimum wa- <br /> ter level.Add a minimum of 12 inches(30cm)of backfill <br /> O DRY HOLE INSTALLATION material to the hole, and level the bed to assure com- <br /> plete bottom support for the tank. Position the tank in <br /> the hole.The 24 inch(61 cm)spacing between tank and <br /> minimum of 12 inches (30cm) of smooth and level pea side wall must be maintained as a minimum in a wet <br /> gravel or stone crushings. (See OO) Place the tank or hole installation. <br /> tanks on the bed carefully. Do not install Xerxes Century- <br /> Cast Tanks directly on a concrete slab,or grout tanks in Partially fill the tank with water until it settles firmly on <br /> wet concrete. Also, do not install these tanks on tim- the prepared bed. Ballast level in a tank must never <br /> bers, beams, cradles or directly on the hole bottom. exceed water level in hole during installation. Use only <br /> enough water to ballast the tank until backfill material is <br /> Leveling even with the top of the tank. <br /> After the tank is bedded, and prior to backfilling, it must Never fill the second- <br /> be leveled. For longitudinal leveling,place the level across clary (external) tank <br /> the tank at the top surface. Lateral leveling is accom- with a fluid. <br /> plished by placing the level across the top of the tank <br /> outlet or manway After leveling tanks, <br /> the anchoring proce- <br /> BaCkfilling dures in Item 9 must <br /> Backfill uniformly with the same material used for bed- be followed. <br /> ding. In freezing conditions make sure the material is Backfill must be added - <br /> dry and free of ice and snow. First,place a 12 inch(30cm) evenly after anchor- - <br /> lift of backfill evenly around the tank. Work the material ing, and remaining dry 12 <br /> completely beneath the tank body and endcaps by hand hole backfilling pro- <br /> in order to provide full support. A board or tamping bar cedures should be - <br /> should be used to followed as stated in <br /> force the material in WRONG � �l Item 7. <br /> place.After the first h <br /> 18-24 inches(46-61 .y u <br /> �,� NOTE:Cover depth must meet minimum depth specified in Item 4 0l <br /> cm) of backfill is in these Installation Instructions. <br /> place, use the ! r' �; t NOTE:It is recommended the tank be ballasted with water or product <br /> tamping bar to work - = - _ 11111=111 once backfill is even with the top of the tank. <br /> the backfill Into the NOTE:Never allow an empty tank to remain In a wet hole or a dry <br /> voids under the hole that may become wet for any period of time without deadmen 1� <br /> edges of the tank RIGHT �° and backfill completed. P <br /> and around the <br /> endcaps. Remain- <br /> der of backfill can <br /> now be done with- - <br /> out further hand <br /> work. <br />