Laserfiche WebLink
10 PIPING AND VENTING isting tanks to less than one-quarter capacity, remove <br /> All piping to the primary tank must be connected to fit- the surface pad. Enlarge the excavation for the new <br /> tings in the manway cover. All internal piping, such as tank, leaving as much backfill as possible around exist- <br /> fill tubes and submerged pumps,must be at least 4 inches ing tanks. It may be necessary to install shoring to make <br /> (10 cm) from the bottom of the tank.The distance from sure that existing tanks do not move and that sufficient <br /> the bottom of the tank to the top of the cover is given in backfill remains. The new tanks must be installed by <br /> the table below. BOTH PRIMARY (INTERNAL) AND following the proce- <br /> dures in this guide. <br /> SECONDARY (EXTERNAL) TANKS MUST BE INDI- <br /> VIDUALLY VENTED TO ATMOSPHERIC PRESSURE. Remember to leave <br /> minimum of 24 inches <br /> Distance (60 cm) between <br /> 111 From Bottom of Tank tanks. The backfill " <br /> Nominal To Top of Fittings on <br /> Tank size Double Wall Manway Cover material must be the <br /> 4 it 550.1000 gal 56%in 143.8 cm same as that specs- _ —►f ;�-3 <br /> 6 it 2000-6000 gal 80'/4 in 203.8 cm Pied in Item 3. <br /> 81t 6000-12,000 gal 1001h in 255.3 cm <br /> 1oft 10,000-20,000 gal 128%in 326.7 cm _p <br /> NOTE:Minimum clearance between bottom of tank and internal pip- i-� i p <br /> ing is 4 inches. <br /> 11 FILLING THE TANK 13 MONITORING <br /> The tank may be filled with water or product after the Xerxes' double wall tank has an air space for the con- <br /> backfill is even with the top of the tank. Only under wet tainment of leaked product from the primary tank. The <br /> hole conditions as described in Item 8, should water or tank,as supplied,will have a minimum of one fitting that <br /> product be added before the backfill is even with the top provides access into the gap between the primary (in- <br /> of the tank. Also, when filling the tank with water or ternal)and secondary(external)tank shell walls. If only <br /> product, make sure the tank is adequately vented. one access fitting is provided the tank must be sloped <br /> CAUTION:The ballast level in the tank must not ex- so that the lowest elevation is the monitoring end. <br /> ceed the water level in the hole during the ballast The monitoring system and method is the responsibility <br /> 1, procedure when sinking tank in a wet hole. Never of the tank owner and/or operator. A safe electric or <br /> fill the secondary(external)tank with fluid. mechanical dip system should be employed to detect <br /> either incoming water or product. The monitor system r <br /> 12 ADDING TANKS AT EXISTING SITES employed must allow the space between the primary <br /> Additional Xerxes Century-Cast FRP Tanks can be in- and secondary tanks to remain vented to atmosphere. <br /> The monitor system should detect leakage near the bot- <br /> stalled at existing locations if proper foundation support <br /> exists.The method of installation is the responsibility of tom of the tank. Monitoring can be done through the <br /> the owner. It is required,however that one of the follow- stallaaccess fitting provided. If the tank t sloped during ng <br /> end. <br /> ing methods be used.The preferred method is to install tion the lowest elevation must be the monitoring <br /> a new tank in a separate hole at least 3 feet (1 meter) end. <br /> from the original hole. Caution must be exercised in CAUTION: DO NOT FILL THE SECONDARY CON- <br /> keeping unusual surface loads off existing tanks. The TAINMENT TANK WITH A FLUID OR OTHER MATE- <br /> natural barrier of undisturbed soil between tanks must RIAL. FAILURE TO COMPLY WILL VOID ALL <br /> be maintained. WARRANTIES. <br /> If this method is not practical, additional tanks may be <br /> buried in the same installation hole. After emptying ex- <br /> PERFORMANCE WARRANTY <br /> Xerxes Corporation warrants that our underground storage tanks, if used in accordance with our specifications and installed <br /> according to our published installation instructions: <br /> (1) Will not fail for a period of thirty(30)years from date of original purchase due to external corrosion. <br /> (2) Will not fail for a period of thirty(30)years from date of original purchase due to internal corrosion, provided the tank is used <br /> solely with or without tank water bottoms for gasoline, gasohol (90% gasoline/10% ethanol mixture), 90.5% gasoline and 9.5% <br /> Oxinol-50'(4.75%methanol and 4.75%GTBA mixture),jet fuel,av-gas,kerosene,diesel fuel,motor oil,or potable water at ambient <br /> underground temperatures;or used for fuel of at temperatures not to exceed 150°F. <br /> (3) Will not fail for a period of thirty (30) years from date of original purchase due to structural failure (defined as breaking or <br /> collapse) provided the installation is performed and validated by a qualified installation contractor and the tank is used as stated <br /> above. <br /> (4) Will meet our published specifications and will be free from material defects in materials and workmanship for a period of one <br /> (1)year following date of original delivery by us. <br /> Xerxes Corporation's liability under this warranty shall be limited to, at our option, (a) repair of the defective tank, (b)delivery of a <br /> replacement tank to the Point of original delivery,or(c)refund of the original purchase price,and we shall not be liable for any labor, <br /> other installation costs, Indirect or consequential damages or other damages in connection with such tanks. THE FOREGOING <br /> CONSTITUTES OUR EXCLUSIVE OBLIGATION AND WE MAKE NO EXPRESS OR IMPLIED WARRANTIES, OR ANY WAR- <br /> RANTY OF MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE WHATSOEVER, EXCEPT AS STATED ABOVE. <br /> *TM.ARCO Chemical Co. Effective 7/15/85 <br />