My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
INSTALL 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:30:42 AM
Creation date
5/15/2019 11:37:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1989
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GUIDE SPECIFICATIONS <br /> DOUBLE WALL <br /> FIBERGLASS REINFORCED PLASTIC (FRP) <br /> UNDERGROUND STORAGE TANKS <br /> SHORT FORM: <br /> The contractor shall provide Double Wall Fiberglass Reinforced Plastic(FRP)U.L.labeled underground storage tanks as shown on the drawings. <br /> Sizes and fittings shall be as shown.The tanks shall be Century-Cast Tanks as manufactured by XERXES CORPORATION. <br /> Tanks shall be tested and Installed with pea gravel or crushed stone as specified in the current installation instructions provided with the tank. <br /> LONG FORM: Section 15177-1 3. Tanks shall be capable of storing gasoline or gasohol(10%ethanol and I <br /> 90%gasoline mixture),jet fuel,diesel fuel,AV gas,potable water at <br /> Part I General ambient underground temperature or fuel oil at temperatures not to <br /> exceed 150°F <br /> 1.01 Related ftrk Specified in Other Sections O, Tanks with 3,000 gal.capacity and larger have two 22"I,D.manways. <br /> A. Liquid Level Gauges:Section 15174 Tanks smaller than 3,000 gal.shall have only one 22"I.D.manway.Each <br /> B. Plastic Pipe:Section 15064 steel manway cover shall have three 4"NPT fittings welded in place. <br /> C. Anchor Botts:Section 05501 D. Materials: <br /> D. Cast-in-Place Concrete:Section 03300 1. Tanks(Primary and Secondary)shall be manufactured with 100 <br /> 1.02 Quality Assurance isophthalic polyester resin and glass liber reinforcement with no sand <br /> A. Acceptable Manufacturer:XERXES CORPORATION liners. <br /> B. Governing Standards;primary tank E Annular Space <br /> 1. ASTM standard document number D4021-81. 1. Tank shall have a space between the primary and secondary shell <br /> 2. Underwriters Laboratories,Inc.(LLL.)File MH 9061(N)for storage of walls to allow for the free flow and containment of all leaked product <br /> flammable liquids.A U.L.certification plate shall be attached to each from the primary tank.Space also allows the insertion of a monitoring <br /> tank. device through a monitoring fitting. <br /> 3. National Fire Protection Association(NFPA30)Flammable and F Tank Dimensions(Refer to Xerxes literature on gallonage.) <br /> Combustible Liquids Code and(NFPA31)Standard for Installation of 1. Tank shall have nominal capacity of gallons. <br /> Oil Buming Equipment. 2. Tank shall have nominal outside diameter-feet. <br /> 4. National Sanitation Foundation,Standard 14. 3. Tank shall have approximate overall length of_feet. <br /> 5. Factory Mutual Systems approval J.I.1G4A0.AF 2.02 Accessories <br /> 6. Military Specifications No.MIL-T-52777(A). A. Anchor Straps-Previde FRP anchor straps as manufactured by tank <br /> C. Governing Standards:secondary tank; manufacturer.Number and location of straps shall be specified in current <br /> 1. Underwriters Laboratories,Inc.(U.L.)File MH 9061(N)for storage of installation instructions of lank manufacturer, <br /> flammable liquids.A U.L.certification plate shall be attached to each B. Manways <br /> tank. 1. All manways to be flanged and 22"I,D.complete with U.L.listed <br /> 2. National Fire Protection Association(NFPA30)Flammable and gaskets,bolls and covers.(30"I.D.manway may be available on .m�f <br /> Combustible Liquids Code and(NFPA31)Standard for Installation of certain size tanks.) <br /> Oil Burning Equipment. 2. Location as shown on drawings. <br /> 1.03 Submittals 3. Manway extension tubes shall be FRP and 24"long for manways <br /> A. Shop Drawings:Contractor shall submit copies of shop draw- shown on drawings. <br /> ings for each tank.Drawings shall show locations of all fittings,accesso- 4. Each steel manway cover shall have three-4"NPT fittings welded in <br /> nes,and critical dimensions. place. <br /> B. Catalog Dale:Contractor shall submit-copies of manufacturers lifer C. Fill Tubes <br /> ature to include copies of manufacturer's current Installation 1. Tubes shall be FRP and factory installed by manufacturer. <br /> instructions. <br /> 2. Location shown on drawing. <br /> 3. Tubes shall be 4"diameter with 6"steel fitting and a 6"x 4"double <br /> PART II Products tapped reducer bushing. <br /> D. Gauge Plates-Shall be installed at location shown on drawing. <br /> 2.01 Double Wall Fiberglass Reinforced Plastic(FRP)Underground Storage E. Heating Coils <br /> Tanks with a Primary(internal)tank and a Secondary(external)tank. 1. Heating Coils shall be installed in separate 22"manways and shall be <br /> A. Loading Conditions-Tank shall meet the following design criteria: standard items supplied by tank manufacturer. �l <br /> 1. Internal load:Primary and Secondary tanks shall withstand 5 psi air 2. Location as shown on drawings. <br /> pressure test with 5 to 1 safety factor.Contractor shall individually test F NPT Threaded Fittings <br /> tanks prior to installation as this is to test for leakage.Maximum test <br /> pressure is 5 psi. 1. All threaded fittings shall be a material of construction consistent with <br /> the requirements of U.L.label. <br /> 2. Vacuum Test:Every tank shall be mercury vacuum tented al the tank 2, All standard threaded fittings shall be half couplings and shall be 4"in <br /> manufacturer to assure structural integrity.to <br /> Primary lank shall be tested 9 <br /> 1011.5 inches and secondary lank tested to 9.5 inches mercury diameter.Reducers are to be used for smaller sizes where shown and <br /> vacuum, provided by contractor. <br /> 3. Surface Loads:Tank shall withstand surface H-20 axle loads when 3. Sizes Standard Other Sizes <br /> properly installed according to current manufacturer's Installation Fill 4" <br /> instructions. Gauge 4" <br /> 4. External hydrostatic pressure:Buried in ground with 7'of overburden Inlet 4" l <br /> over the lop of the tank,the hole fully flooded and a safety factor of 7:1 Outlet 4" <br /> against general buckling. Vent 4" <br /> 5. Tanks shall support accessory equipment such as heating coils,drop 4. Suction Line-Shall be installed by contractor on site.Pipes shall <br /> tubes,submersible pumps,ladders when installed according to tank terminate a minimum of 4"from bottom of tank. <br /> manufacturer's recommendations and limitations. 5. Return line shall be installed by contractor. <br /> B. Product Storage: G. Monitor Fittings <br /> 1. Tanks shall be capable of storing petroleum with specific gravity up to 1. Tank shall have two test monitor fittings consisting of a 2"NPT fitting on <br /> 1.1. the primary lank and a 6"NPT fitting directly above on the secondary - <br /> 2. Both primary and secondary tanks shall be individually vented to atmo- tank. <br /> spheric pressure.The tanks are not designed as pressure vessels. 2. Tank shall have two monitor fittings,one near each end of the tank. ^` <br /> X E RX E S O CENTURY FIBERGLASS" <br /> HEIL PROCESS EQUIPMENT'" <br /> QRNYTE'"FIBERGLASS <br /> CT 123;DWT 10/85 CORPORATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.