My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1989
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
INSTALL 1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:30:42 AM
Creation date
5/15/2019 11:37:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1989
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTALLATION CHECKLIST <br /> Xerxes Century-Cast Fiberglass Underground Storage Tank(s) <br /> Double Wall <br /> To: Installation Supervisor From: Xerxes Corporation Subj: Installation Checklist <br /> Read the preceding Tank Installation Instructions, then fill in the information below.As the tank installation progresses,fill in each applicable <br /> inspection,testing and installation checklist item below,initialing the items as its conditions are satisfactorily met.(Refer to Installation Instructions y <br /> for details.)The tank's U.L.number can be found on the U.L.label next to the lifting lug. <br /> When the checklist is complete,tear off at the dotted line and mail to: <br /> XERXES CORPORATION,7901 Xerxes Avenue South,Minneapolis,MN 55431. <br /> INSTALLATION DATE(S) <br /> TANK'S U.L.NUMBER <br /> SITE OWNER <br /> SITE ADDRESS <br /> INSTALLATION CONTRACTOR <br /> INSTALLATION SUPERVISOR <br /> PRIOR TO INSTALLATION: Verified by: <br /> A.Visual inspection. No evidence(holes,cracks,deep scrapes)in domes,or flats of damage to the tank from physical <br /> abuse or a blow from a hard object. <br /> B.Physical testing.Completed in accordance with current Xerxes Double Wall Installation Instructions(5 psig pressurk <br /> zatlons and soap test). <br /> C.Backfill material(indicate material type). <br /> 1.Pea Gravel per specification in Installation Instructions. <br /> 2.Crushed Gravel or Stone per specification In Installation Instructions. <br />( 3.Other(requires specific approval by Xerxes rep.)Describe: <br /> D.Excavation hole size.Hole dimensions are correct per Installation Instructions for stable and unstable walls. <br /> E.Hole conditions(select one): <br /> 1.Dry hole.Ground water elevation not anticipated to reach tank and area not subject to flooding.(Dry hole installation) <br /> 2.Wet hole.Ground water elevation expected to reach tank or area subject to flooding.(Wet hole installation) <br /> F Traffic load(select one): <br /> 1.Traffic loading anticipated.(Requires deep burial per Installation Instructions.) <br /> 2.No traffic loading.(Allows normal burial per Installation Instructions.) <br />' DURING INSTALLATION: <br /> A.Backfill material bed is level and at 12"(300mm)minimum depth over native soil or slab prior to setting tanks in place. <br /> B.Tanks set in place with correct spacing from wall and other tanks. <br /> C.Deadmen and tie downs positioned and secured in accordance with Installation Instructions.(Wet hole installation) <br /> D.Backfill material tamped and compacted to fill all voids around tank. <br /> t E.Tank properly ballasted during backfill.(Wet hole installation only.)Never fill secondary(external)tank with ballast. <br /> w F. Tank(s)buried at proper depth to conform to wet or dry hole;traffic or no traffic conditions. <br /> INSTALLATION TESTING: <br /> All tanks with manways must be inspected from the inside after installation. Visually inspect the tank for any signs <br /> (cracks,holes,indentations)of physical damage. <br /> MEASUREMENT OF DEFLECTIONS: <br /> at A.All tanks must be measured to determine vertical tank deflection during Installation. <br /> Interior diameter of tank Interior diameter of tank <br /> prior b backfilling. after backfilling to subgrade. Oelleation <br /> IAI - tel <br /> Maximum Allowable Deflections: Tank Diameter Deflection <br /> 4' '/a" <br /> 6' <br />_ 8• <br /> 10' 1'/2„ <br /> f <br /> Vertical deflection in excess of these values indicates improper installation and voids the tank warranty. <br /> XERXES MANUFACTURING FACILITIES XERXES CORPORATE OFFICE <br /> a 34250 Mills Road 22001 Proform Road 351 North Virginia Avenue 7901 Xerxes Avenue South <br /> 2 <br /> ( Avon, 7.8051 (512)372-0090 11 Seguin, 55 P.O.Box <br /> Grove,NJ 08069 (612)8 871890 N 55431 <br /> (216) <br /> (609)299-0632 <br /> Building 316 Airport 1210 N.Tustin Avenue <br /> Industrial Park P.O.Box 6069 <br /> P.O.Box 469 Anaheim,CA 92806 <br /> W Bartow,FL 33830 (714)630.0012 <br /> (813)533-9047 <br />. i <br />,j <br />
The URL can be used to link to this page
Your browser does not support the video tag.