My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
INSTALL 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:32:25 AM
Creation date
5/15/2019 11:44:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2001
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLASTEEL Composit <br /> '�F INSTALLATION INSTRUCTIONS Tank <br /> 1. GENERAL and the pad. Upon AHD approval,you may set and securely anchor <br /> The PLASTEEL'COMPOSIT underground tank is a the PLASTEEL• tank directly on the smooth, flat pad taking <br /> U.L. Listed composite tank providing corrosion protection per care to place a [T'wide x I"thick piece of felt between the entire <br /> U.L. 1746 <br /> tank bottom centerline and the pad to minimize damage during <br /> in double-wall and single-wall designs. placement.Consult factory for other anchoring techniques. <br /> COMPOSIT underground tanks must be installed according <br /> to these installation instructions, the latest issue of the N.F.P.A. 30 VI. TESTING <br /> and the authority having jurisdiction(AHJ). Composit tanks are designed for atmospheric service. Test <br /> The installer and/or owner must read and be familiar with the procedures shall be in accordance with these instructions, <br /> entire installation instructions prior to installing the COMPOSIT N.F.P.A. 30, and the AHJ. Insert and tighten steel plugs in unused <br /> tank. To activate the PLASTEEL' COMPOSIT Tank pipe connections. <br /> Warranty, a completed and signed Certificate of Installation for the <br /> additional installation references, <br /> Test pressure shall not exceed 5 psi. When pressure testing <br /> returned to the manufacturer. For aad <br /> PLASTEEL COMPOSUnderground Tank mus[ be the piping, the tank must be isolated and not subjected to the consult the current editions of: higher pressures. <br /> — Petroleum Equipment Institute,RP-100 DOUBLE-WALL: Test inner tank at a maximum of 5 psi. <br /> — American Petroleum Institute,RP-1615. Do NOT pressurize interstice (volume between tanks) by itself. <br /> If outer tank must be tested,use a tee fitting to pressurize inner tank <br /> 11. VISUAL INSPECTION and interstice simultaneously. After test, release simultaneously. <br /> Prior to setting tank in hole, inspect exterior for damage. If tank Never allow interstice pressure to exceed primary (inner) tank <br /> exterior is damaged,call factory regarding correct repair procedures. pressure. For additional instructions,consult factory. <br /> Exterior damage is indicated when the blue color of the FRP CAUTION: Damage to tank may occur if pressure in primary <br /> laminate has shown a white fractured pattern. tank exceeds 5 psig or pressure in interstice exceeds <br /> pressure in primary tank. <br /> 111. HANDLING The tank may be delivered with an interstitial vacuum established <br /> Good construction engineering practice, common sense and at the factory.The delivery document will state the vacuum gauge <br /> safety must prevail during this phase. PLASTEEL• tanks are reading required for acceptance at the delivery location. Record the <br /> not to be dropped or rolled off of the delivery vehicle onto the vacuum gauge reading on the delivery.document when the tank is <br /> ground or into the hole.The lifting hook or hooks provided mus[be delivered. If the vacuum gauge has decreased from the vacuum <br /> used in combination with the proper capacity unloading equipment. gauge reading listed for acceptance on the delivery document,call <br /> It is the responsibility of the owner to provide the qualified the factory for further instructions. If an interstitial vacuum is to be <br /> personnel and safe. proper unloading equipment, with specific established at the installation,follow the instructions in Appendix B. <br /> consideration given to tank weight and reach distance to set tank in Interstitial Vacuum Test. DO NOT apply a vacuum to the primary <br /> excavation. The preferred lifting cable included angle is 60° and tank.DAMAGE NIAY OCCUR. <br /> must never exceed 1200. A spreader bar may be used to achieve - OPTION: See Appendix B for a final installation tightness test <br /> this angle. that complies with E.P.A. leak tightness test protocol. <br /> IV. EXCAVATION DEPTH, VII. VENTING: <br /> BEDDING AND BACKFILL DOUBLE-WALL TANK <br /> Follow all applicable local regulations and codes. When The PRIMARY (inner) tank mus[ always be vented to <br /> excavating,allow a minimum clearance of 6"for backfill around the atmosphere. The interstice (space between inner and outer tank) <br /> tank. For minimum burial cover.consult N.FP.A.30. If burial cover should be scaled air tight. Follow local codes. <br /> over top of tank exceeds five (5) feet, consult factory. Backfill CAUTION: If interstice venting is required, interstice vents may <br /> materials should be clean. debris free, sand or pea gravel. be manifolded together. DO NOT MANIFOLD vents <br /> Hydrocarbon exposed sand or pea gravel may be re-used if approved from primary tank with vents from interstice. <br /> by the AHJ. Native sand may be used if approved by the tank man- <br /> ufacturer and the AHJ.Allow a minimum of 13"of backfill between V Ill. PLASTEEL'SEALING <br /> traffic slab and all appunenances that are attached to the tank. PROCEDURES <br /> Damage to tank may occur if surface traffic loads are transmitted These procedures must be performed prior to completion of <br /> directly to lank. backfill and AFTER TESTING. To ensure complete corrosion <br /> V. ANCHORING SYSTEMS protection,the following instructions must be followed: <br /> a. General instructions for working with fiberglass resin <br /> CAUTION: The decision to use an anchoring system is the <br /> responsibility of the owner. Damage to the tank may BY carefully performing the following steps. your <br /> occur if the tank is subjected to movement. PLASTEEL tank will be fully protected from corrosion. <br /> The kit includes materials for covering and protecting the unused <br /> Consult the factory for number, size and type of hold-down tank connections, tank handling hooks, and each of the pipe <br /> assemblies required when using a co5crete pad under the tank. You connections on top of the tank.The PLASTEEL'kit contains <br /> may set and securely anchor the PLASTEEL• tank on the pad hazardous materials.Read the enclosed material safety data sheets <br /> with a minimum of 6" of backfill between tank bottom centerline before proceeding to work with PLASTEEL' kit materials. <br />
The URL can be used to link to this page
Your browser does not support the video tag.