Laserfiche WebLink
PLASTE_ EL® UNDERGROUND TANK <br /> APPENDIX B <br /> INTERSTITIAL VACUUM TEST (IVT) <br /> 1.0 Introduction[ This test method has been developed by down on the ELUTRON® jacketed tank may require <br /> PLASTEEL INC.to meet the E.P.A.Alternate(Non-Volumetric)Tank Tightness reiteration due to the slow nature of air movement in the <br /> test procedures. The IVT has been verified by a third patty to be capable of interstitial space. <br /> detecting a 0.1 gallhr teak rate with a probability of detection of 100%. when all 5 To ensure a vacuum has been established,the gauge must <br /> of the testing criteria are MCL The false alarm rate for a tight tank is less than read sur hg. for threes hour without any decrease on <br /> 5%.h is impossible to maintain n steady vacuum if a leak is present.This test is the gauge before proceeding with 5.6. Contact the <br /> not necessary to attain the PLASTEEL®tank warranty.This test is offered as a factory if the vacuum cannot be established per this <br /> stand alone leak tightness test method. paragraph. <br /> 2.0 Aoolicatlon: The IVT is applicable to the PLASTEEL® 5.5 - Complete sections 11 and III of the Certificate of <br /> ELUTRON® (jacketed) Double-wall tank and the PLASTEELO Composit Tightness Test. <br /> Doubte-wall tank. For compartmented tanks, consult the factory for the test 5.6 Refer to the Test Time Table (Figure 6.0) to determine <br /> time. the correct minimum time period for a valid test. <br /> 3.0 Authority: The Jurisdiction Having Authority (JHA) will determine Begin timing the test after completing 5.4. Record the <br /> whether the double-wall UST must be subject to a leak tightness test before nominal tank capacity, primary tank product and <br /> placing the UST in service. required[est hours in Part IV of the Certificate. <br /> 4.0 Pre Delivery Procedure: 5.7 After the required test time has passed• observe the <br /> gauge reading and record the reading,date and time of <br /> 4.1 Read and understand the PLASTEEL® Tank Installation day in Part IV of the Certificate. <br /> i instructions and Appendix B before attempting the interstitial 5.3 Test Conclusions:The tank has passed the leak tightness <br /> vacuum test. Contact the PLASTEEL® tank manufacturer if you [est when the final gauge reading has not decreased from <br /> j have any questions. the initial gauge reading of 10"Hg. If other observations <br /> 4.2 Consult the PLASTEELS tank manufacturer before the tank is are made,consult the tank manufacturer. ' <br /> shipped to ensure that the tank is delivered with the test gauge <br /> assembly. This assembly is an optional piece of equipment Test Time Tables: The table in Figure 6.0 lisp the ' <br /> supplied by the tank manufacturer. minimum test period(in hours) to perform a valid IVT with a <br /> 4.3 Prior to shipment from the factory you may request that the dry fair only) primary tank. The IVT les[ may be performed <br /> manufacturer deliver the tank with the vacuum established. `with gasoline,diesel or water in the primary tank. Consult the <br /> PLASTEEL® tank manufacturer for the specific test time for <br /> 4.4 Upon delivery, the delivery document will indicate the correct these situations. <br /> vacuum gauge reading. Cali the factory if the gaugz reading does <br /> meet the gauge reading specified on the delivery document. <br /> TEST TIME TABLE:DRV PRIMARY TANK <br /> 45 To maintain the vacuum during the unloading and installation <br /> phases. extreme care must be taken to -ensure the IVT gauge CAPACITY JACKETED COMPOSIT <br /> assembly is not jarred, struck or moved in any manner. Call the (GALS.) (HOURS) (HOURS) <br /> factory for instructions if the vacuum has decreased. 500 4.0 4.5 <br /> 5.0 Test Pracedures: I.0GC 4.0 5.5 <br /> 5.1 If the vacuum was established at 2.000 4.0 9.0 <br /> QUICK -. -31-i-E.RFLY delivery and has not decreased 3.000 4.0 9.0 <br /> ;Cptionail VALVE during the unloading and i.CCO I 4.0 9.5 <br /> installation erases. you may <br /> J by-pass 5.2 and 5.3 ccC 4.0 los <br /> j _ 4.3 tt.0 <br /> i Install t4C ,urr_-p gauge test 5..c0 <br /> �* thz <br /> .i v-:e:nb�: Itae i_. 5.�)I En 9000 13 13.0 <br /> mon:.-.Or SCCei.i `77 <br /> zoupling On <br /> •` � too .e :erlie. Esura IO•.CO <br /> y 14.5thaany ad.'i[iJ^a. ROniWr 1 .5thz tank 2.: <br /> I - IN??BTITIA_ ae.^es5 zot10linai ace- properly 13,OGC 3.J 1 17.5 <br /> Id'GNITCA Sealed wah ;F.re1c.' dugs. <br /> I -(NO 20:.OG 19 20.5 <br /> ; � _.- ConOacr :he `'•a__m-pump :o <br /> t"-- est 3au2' s,,_ -.; and OC Cr 1.3 37a <br /> dra•.y <br /> w^ . . Rzard 1c..cc 1 C 45.5 <br /> i <br /> =,G:R=_5..:YACLU'.' 3AUGE . . -,-G -c _=. and <br /> :n;C:1! gaL' e .-_ .._ _ y,3 53.3 <br /> ,/OICA_. ; a1� ?an ! of :he ..0 <br /> 'CU=ACY:AS`.IE'AVSB 3P:..7E 3. :' L <br /> -2,,.-3r•w,.xtt1 ""':'3RADUA71GNS. Ce......atz. T:'- ......11 Pump FIGURE 6.0 <br />