My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
INSTALL 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:32:25 AM
Creation date
5/15/2019 11:44:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2001
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> PL ASTEeLa0 U .0 RGROUND TANK <br /> APPENDIX B <br /> INTERSTITIAL VACUUM TEST (IVT) <br /> 1.0 Introduction: This test method has been developed by down on the ELUTRONS jacketed tank may require <br /> PLASTEEL INC.to meet the E.P.A.Alternate(Non-Volumerric)Tank Tightness reiteration due to the slow nature of air movement in the <br /> test procedures. The IVT has been verified by a third party to be capable of interstitial space. <br /> detecting a 0.1 gaVhr leak rate with a probability of detection of 100%when all <br /> of the testing criteria are met.The false alarm rate for a tight tank is less than ]•4 To ensure a vacuum has been established,the gauge must <br /> 5%.It is impossible to maintain a steady vacuum if a leak is present.This test is read 10"hg. for three(3)hours without any decrease on <br /> not necessary to attain the PL4,STEELS tank warmnty.This test is offered as a the gauge before proceeding with 5.6. Contact the <br /> stand alone leak tightness[est method. factory if the vacuum cannot be established per this <br /> paragraph. <br /> 2.0 Ayolieation: The IVT is applicable to the PLASTEELS 5.5 Complete sections 11 and III of the Certificate of <br /> ELUTRONS Qacketed) Double-wall tank and the PLASTEELS Composit Tighmess Test. <br /> Double-wall tank. For compartmented tanks, consult the factory for the test 5.6 Refer to the Test Time Table (Figure 6.0) to determine <br /> time. the correct minimum time period for a valid test. <br /> 3.0 Authority: The Jurisdiction Having Authority (JHA) will determine Begin timing the test after completing 5.4. Record the <br /> whether the double-wall UST must be subject to a leak tightness rest before nominal tank capacity, primary tank product and <br /> placing the UST in service. required[est hours in Part IV of in-Certificate. <br /> .4.0 Are-Clellvery Procedure: 5.7 After the required test time has passed, observe the <br /> gauge reading and record the reading, dace and time of <br /> 4.1 Read and understand the PLASTEELS Tank Installation day in Part IV of the Certificate. <br /> instructions and Appendix B before attempting the interstitial <br /> vacuum test. Contact the PLASTEELS tank manufacturer it you 5.3 Test Conclusions:The tank has passed the leak tightness <br /> have any questions. test when the final gauge reading has not decreased from <br /> the initial gauge reading of 10"Hg. If other observations <br /> -t.? Consul[ the PLASTEELS tank manufacturer before the tank is are made,consult the rank manufacturer. <br /> shipped to ensure that the tank is delivered with the test gauge <br /> L assembly. This assembly is an optional piece of equipment Test Time Tables: The table in Figure 6.0 lists the <br /> supplied by the tank manufacturer. minimum test period (in hours) to perform a valid IVT with a <br /> 4.3 Prior to shipment from the factory. you may request that the dry (air only) primary tack. The IVT test may be performed <br /> manufacturer deliver the tank with the vacuum established. with gasoline, diesel or water in the primary tank.Consult the <br /> PLASTEELS tank manufacturer for the specific test time for <br /> 4.4 Upon delivery. the delivery document will indicate the correct these situations. <br /> vacuum gauge reading. Call the factory if the gauge rending does <br /> meet the gauge reading specified on the delivery document. <br /> 45 To maintain the vacuum during the unloading and installation TEST TIME TABLE:DRY PRIMARY TANK <br /> phases, extreme :at, must be taken to ensure the IVT gauge CAPACITY JACKETED COMPOSIT <br /> assembly is not jarred. struck or moved in any manner. Call, the (GALS.) (HOURS) (HOURS) <br /> factory for instructions if the vacuum has decreased. <br /> 500 4.0 4.5 <br /> 5.0 Test Procedures[ 71000 4.0 5.5 <br /> QUICK 5.1 If the vacuum was established at 2.000 4.0 6.0 <br /> 01SCONNECT BUTTERFLY delivery and has not decreased 3:700 4.0 9.0 <br /> {C^„t'onait VALVE durng the unloading and 4,:Co l.a es <br /> installation phases. you may <br /> I I y f b;%-?ass 5..and 5.3 5.700 eta 'a5 <br /> �} lnsal [hz cac0nm gauge test 9._ea 4.7 tta <br /> ]i5tt'Ci-; '>dd Fig. 5A. in rhd 3.SCC 1 13:7 <br /> .^.xm[a,ac,:zss `PT zoo?!ing 0r, <br /> e.c le <br /> s <br /> the tank ore cznrzrline. Ensure <br /> :hat am-` 1' ,wma! rnCni:ar t2.:C0 +.: 10.5 <br /> I?I-_?S7� : axes: ..71;n'.'i and cr-er:y <br /> t S;CCC 4.7 17.5 <br /> I -+ !_1C?IIT''; ;waled tvun thczadad ?logit <br /> I -.. ING 20.-'CC 4.3 <br /> vacuum ?Limp :a las <br /> the :_ .dacz• asiernM% and 3C_ct s7 3'S <br /> =G'.=._;., ,._:,:.:;yt 3A6GE cra-., ,!�,n :o IO" cg. Rzccr_' IC,-Co d. 45.5 <br /> _i-Ass=_r.I=__• --•='CA7.. ':c.^.! _]u_e :--ading. cats. at..-' _ <br /> =UZA:'. >SMS 'ANSIt 30A71E S. t:-_ dlv to Par: IV o ^e I <br /> J.7 53.7 <br /> i =2',,. :-]C'H.,.Wi!11•4; 3RA7UA7:Cr;S. Cz.....0atz. T;:_ ......al =7.? FIGURE 6.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.