My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2001
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
INSTALL 2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 11:32:25 AM
Creation date
5/15/2019 11:44:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2001
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />O <br />W. A. CRAIG, INC, c <br />Environmental Contracting and Consulting :v <br />6940 Tremont Road <br />Dixon, California 95620 - - <br />Contractorand Hazardous Substances License #455752 <br />L,1 <br />(800)522-7244 <br />Dixon (707) 693-2929 Napa (707) 252-3353 <br />Fax: (707) 693-2922 <br />Date: 5-25-2000 <br />To: Michael Kith- Sr. REHS <br />San Joaquin County <br />Environmental Health Division <br />Phone 209.468-3420 <br />From: Steve Hardister, Sr. Project manager <br />W.A. Craig Inc. <br />Re: Our job number 3900 <br />Response to letter Dated May 24, 2000 on App 'cation for permit to install new piping at <br />Mason Center LLC, 6425 Pacific Ave., Stockton, Ca. <br />Please find below a list of responses corresponding to your list of inquires <br />1. Lincoln Properties LTD is the property owner <br />Mason Center will be the new owner of the existing tanks <br />2. Certificate of training will follow this letter response <br />3. Please use cut sheets for Bravo boxes as the accurate dispenser sump proposed for this project (3) <br />3+0 will be 36" and (3) 3+1 will be 48" <br />4. The overfill -spill containment will be 15 gal for the fill and the vapor recovery Phase I will be 5 <br />gal <br />5. Cut sheets on the Rex boots will follow this letter <br />6. Cut sheets on sensors and probes will follow this letter <br />7. Turbine sumps are existing and will not be changed <br />8. Tanks are existing and are assumed to have striker plates, We will be looking into documentation <br />that they do exist <br />If you could help with this by researching your records on file of these existing tanks it would <br />greatly be appreciated <br />9. The tanks are existing and the plan is that they stay existing, on page 5 explains (use only as <br />needed) <br />10. The location for the monitoring panel is undetermined at this time due to the potential of latter <br />remodeling of this existing building <br />The proposed location at this time is in the South—West Corner of the building, we will be <br />submitting as built drawings at the completion of this project <br />11. I was told by Western Geo (The consultant for this site) that the site map for the location of the <br />existing monitoring wells was on file with your office <br />12. Page 6 will be redone and resubmitted for your review, the fiber glass piping does not penetrate the <br />surface as shown <br />13. Cut sheets and information for the proposed new submersible pumps and line leak detectors will <br />follow this letter <br />Any questions please call Steve Hardister @ 1-800-522-7244 <br />
The URL can be used to link to this page
Your browser does not support the video tag.